- All Categories (229)
- Data (1)
- News (15)
- Missions (7)
- Events (11)
- Tools (1)
- Activities (6)
- Documents (188)
Event - Meeting
VH-RODA and CEOS SAR workshop
The workshop provided an open forum for the presentation and discussion of current status and future developments related
Event - Meeting
PROBA-V QWG meeting 13
The latest delay in the schedule of the PV-CC launch (currently Q1/Q2 2022) changed the approach for exploitation, notably
Data - EO Sign In Authentication (Open)
Landsat 8 Collection 2 European Coverage
terrain corrections applied and resampled for registration to a cartographic projection, referenced to the WGS84, G873, or current
Activity - Quality
EDAP
The following missions are currently being considered as part of the Automatic Identification System (AIS) and Radio Frequency
News - Success Stories
The Earthnet Programme: 40 years of evolution and future challenges
Giuseppe Ottavianelli Title: Current Earthnet TPM Programme Manager Description: Giuseppe Ottavianelli, Earthnet TPM Programme
Event - Meeting
PROBA-V QWG meeting 10
During the meeting the review of current mission performance focused on calibration and on the assessment of impact of the
Event - Workshop
IDEAS+ Cal/Val Workshop 7
Regular workshops are held every nine months with the whole IDEAS+ Task 3-Cal/Val team in order to review the status of current
Activity - Instrument characterisation and algorithm studies
ESA satellites and instruments calibration landing page
Data Outages: Information currently not available online.
News - Thematic area articles
How satellite data help to shape society
Title: Current drought situation in Ebro basin Description: The SMOS soil-moisture-based drought monitor is updated monthly
Event - Workshop
VH-RODA 2021 Workshop
the Workshop will provide an open forum (new space, commercial and institutional) for the presentation and discussion of current
Event - Meeting
PROBA-V QWG meeting 9
During the current meeting these options will be reviewed more in details and final recommendations from the QWG will be
Event - Meeting
PROBA-V QWG meeting 16
The main topics of the meeting were recalled with summary of current status and open points for discussion: Mission Status
News - Data Release news
New Landsat-8 Collection-2 Level 1 and Level 2 data now available
The Online Dissemination service is still being populated, with the current availability of Collection-2 data as follows:
Activity - Quality
SLAP
Currently, in excess of 701,000 Level 1 TM and 84,000 Level 1 ETM+ products have been reprocessed and released under the
Activity - Instrument characterisation and algorithm studies
PV-LAC-ATMO
The current operational Atmospheric Correction applied to Proba-V TOA observations (Sterckx et al. 2014) uses the Simplified
Document - General Reference
PROBA-V-QWG-10-Report-Summary.pdf
This report provides a summary of PROBA-V QWG meeting 10.
Event - Training
EO Summer School 3
In line with observations it shows anti-cyclonically rotating surface currents and cyclonically rotating bottom currents.
Document - Publication - Paper
cloud_detection_FUB.pdf
Proba-V Cloud Detection Round Robin Meeting document