- All Categories (299)
- News (21)
- Missions (10)
- Events (13)
- Tools (2)
- Activities (8)
- Documents (245)
News - Success Stories
Long-term satellite data show wind farms can affect local air currents
Long-term measurements allow before and after comparison Data from the heritage Envisat satellite currently maintained accessible
News - General News
Go-to guide to Third Party Mission data offering
Data Access Guide has been published, providing technical details and information on available data collections for all current
Event - Meeting
VH-RODA and CEOS SAR workshop
The workshop provided an open forum for the presentation and discussion of current status and future developments related
Event - Meeting
PROBA-V QWG meeting 13
The latest delay in the schedule of the PV-CC launch (currently Q1/Q2 2022) changed the approach for exploitation, notably
Activity - Quality
EDAP
The following missions are currently being considered as part of the Automatic Identification System (AIS) and Radio Frequency
Event - Meeting
PROBA-V QWG meeting 10
During the meeting the review of current mission performance focused on calibration and on the assessment of impact of the
Activity - Instrument characterisation and algorithm studies
ESA satellites and instruments calibration landing page
Data Outages: Information currently not available online.
Event - Workshop
SEASAR 2012
Aouf 14:00 - 14:20 Towards consistent inversion of wind, waves and surface current from SAR Bertrand Chapron (IFREMER, France
Event - Workshop
VH-RODA 2021 Workshop
the Workshop will provide an open forum (new space, commercial and institutional) for the presentation and discussion of current
Mission - Heritage Missions
PALSAR
A small percentage of ALOS-1 PALSAR products processed by the current installed ESA IPF are affected by a known quality issue
Mission - Heritage Missions
PALSAR Processor Releases
The current ALOS-1 PALSAR IPF integrated within the ESA On-The-Fly system is v4.16p9, installed on 24 January 2017.
News - Events and Proceedings
Φ-Week Triumphs
Opening Session Title: Φ-Week's Opening Session Description: During the fourth edition of ESA’s Φ -Week, Josef Aschbacher, current
Event - Meeting
PROBA-V QWG meeting 9
During the current meeting these options will be reviewed more in details and final recommendations from the QWG will be
Document - Proceedings
SEASAR-2012-sessions-summaries-seed-questions-recommendations.pdf
This document gathers together the sessions summaries with seed questions discussion and recommendations of the SEASAR 2012 workshop.
Event - Meeting
PROBA-V QWG meeting 16
The main topics of the meeting were recalled with summary of current status and open points for discussion: Mission Status
Activity - Quality
SLAP
Currently, in excess of 701,000 Level 1 TM and 84,000 Level 1 ETM+ products have been reprocessed and released under the
Activity - Instrument characterisation and algorithm studies
PV-LAC-ATMO
The current operational Atmospheric Correction applied to Proba-V TOA observations (Sterckx et al. 2014) uses the Simplified
Document - Product Document
ALOS-PALSAR-Quality-Disclaimer.pdf
This document provides a quality disclaimer for an ALOS PALSAR IPF failure.
Document - General Reference
PROBA-V-QWG-10-Report-Summary.pdf
This report provides a summary of PROBA-V QWG meeting 10.