- All Categories (138)
- Data (2)
- News (11)
- Missions (6)
- Events (8)
- Tools (2)
- Activities (4)
- Documents (105)
Document - Conference Presentation - Poster
04_OCT2013_ESA-EO_programmes.pdf
ESA EO missions and their exploitation for science and applications ESA
Document - Proceedings
1st MSG RAO Workshop
Proceedings of the workshop organised by ESA and EUMETSAT held in CNR of Bologna, Italy in May 2000.
Event - Workshop
2nd MERIS/AATSR User Workshop
Inform users on the current status of the Copernicus Sentinel-2 and 3 payloads.
Event - Workshop
2nd Space for Hydrology Workshop
The workshop aimed to assess the current stage of knowledge and activities in space-based hydrological observations and to
Document - Proceedings
2nd-MSG-RAO-Workshop.pdf
Proceedings of the 2nd MSG RAO Workshop, held on 9-10 September 2004 in Salzburg, Austria
Document - Proceedings
3rd-MSG-RAO-Workshop.pdf
Proceedings of the 3rd MSG RAO Workshop held on 5 June 2006 in Helsinki, Finland
Document - Technical Note
A-comparison-of-superresolution-reconstruction-methods-for-multiangle-CHRIS-Proba-images.pdf
This paper presents the results of three superresolution methods applied to multiangular CHRIS/Proba data: three methods, namely non-uniform interpolation and de-convolution, iterative back-projection, and total variation are examined.
Event - Training
Advanced Training Course in Land Remote Sensing 2012
Objectives The objectives of this advanced Dragon training course were: To inform on past, current and future EO satellite
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 07 Sep 2007
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 08 Dec 2007
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 09 Jun 2008
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 09 Mar 2008
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 09 Sep 2008
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 10 Dec 2008
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 12 Jun 2009
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 12 Mar 2009
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 12 Sep 2009
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 13 Dec 2009
Instrument Unavailability .................................................................................... 5 3.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 15 Jun 2010
Checks are currently made on a weekly basis (header parameters, PDS status) to have a constant view on the mission status
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 15 Mar 2010
Current CFI is in configuration 6.4. Previous one was configuration 6.1.