- All Categories (72)
- News (2)
- Missions (5)
- Events (3)
- Documents (62)
Event - Workshop
SEASAR 2012
Aouf 14:00 - 14:20 Towards consistent inversion of wind, waves and surface current from SAR Bertrand Chapron (IFREMER, France
Mission - Heritage Missions
PALSAR
A small percentage of ALOS-1 PALSAR products processed by the current installed ESA IPF are affected by a known quality issue
Mission - Heritage Missions
PALSAR Processor Releases
The current ALOS-1 PALSAR IPF integrated within the ESA On-The-Fly system is v4.16p9, installed on 24 January 2017.
Event - Workshop
Fringe 2011 Workshop
The Fringe series of workshops started in 1992 and they are currently organised by ESA every two years.
News - Thematic area articles
How to use space data to probe humankind’s ancient past
SkySat captures Angkor Wat in Cambodia TPMs that are currently providing high resolution or very high resolution imagery
Document - Proceedings
Fringe-2011-workshop-session-summaries.pdf
This document contains the session summaries from the session summaries of the Fringe 2011 workshop.
Mission - Heritage Missions
PALSAR Quality Control Reports
Find out more Quality Disclaimer A small percentage of ALOS-1 PALSAR products processed by the current installed ESA IPF
Event - Workshop
POLinSAR 2013
Snow, Land Ice and Sea Ice Monitoring Hazards: Fire Monitoring, Volcanoes, Flooding, Earthquake Other applications Past, current
Mission - Heritage Missions
ALOS-1 Mission Objectives
Oceanography and coastal zone-related research (oil spill, high-resolution DEM) Coastal zones, sea surface wind, wave height, wave current
Mission - Heritage Missions
PALSAR Products Information
The service currently provides access from ESA's archive to the following PALSAR L1 high-resolution data products.
News - Success Stories
Commercial and international data for fire monitoring
The Finnish ICEYE constellation, added to the TPM programme in 2021, currently consists of 27 synthetic aperture radar (SAR
Document - Quality Report
ALOS-1 PRISM Cyclic Report 25 Jan 2009
Unplanned Instrument Unavailability..................................................................................6 3.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 15 Mar 2010
Current CFI is in configuration 6.4. Previous one was configuration 6.1.
Document - Quality Report
ALOS-1 PRISM Cyclic Report 09 Sep 2008
Checks are currently made on a weekly basis (header parameters, PDS status) to have a constant view on the mission status
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 25 Jan 2009
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 24 Apr 2008
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 PRISM Cyclic Report 25 Jul 2008
� 3 SOFTWARE & AUX FILE VERSION CONFIGURATION Current Optical Processor Version ESRIN Matera Tromso 4.05 09/
Document - Quality Report
ALOS-1 PRISM Cyclic Report 10 Dec 2008
Checks are currently made on a weekly basis (header parameters, PDS status) to have a constant view on the mission status
Document - Quality Report
ALOS-1 PRISM Cyclic Report 15 Mar 2010
Current CFI is in configuration 6.4. Previous one was version 6.1.
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 09 Mar 2008
Unplanned Instrument Unavailability..................................................................................5 4.3 Current