SEE RESULTS FOR
"Current"
BY CATEGORY
All categories
(A)ATSR Expert Support Laboratory FAST Level 1b Product Definition
(A)ATSR Expert Support Laboratory FAST Level 1b Product Definition.pdf
04_OCT2013_ESA-EO_programmes.pdf
ESA EO missions and their exploitation for science and applications ESA
05_OCT2013 SMOS_NREUL_partI.pdf
The SMOS mission Dr. Nicolas Reul (IFREMER, France)
06_OCT2013_SMOS_NREUL_partII.pdf
Ocean salinity with SMOS Dr. Nicolas Reul
07_OCT2013_SMOS_Practical.pdf
BEAM practical exercises Dr. Carsten Brockmann (Brockmann Consult, Germany)
10_Lopez_VAS.pdf
SMOS Validation and Retrieval Team Readiness Review Workshop 2009 Posters and Presentations - SMOS Validation Rehearsal Campaign at the VAS site (E.Lopez)
2nd SMOS Science Conference
The objectives of the 2nd SMOS Science Conference were: To provide the SMOS science communities with an update on past, current
2nd Space for Hydrology Workshop
The workshop aimed to assess the current stage of knowledge and activities in space-based hydrological observations and to
34th AATSR QWG Meeting Summary
The 34th AATSR QWG Meeting was held on 28th/29th March 2017 at RAL, Harwell, U.K. ThisMemorandum states the objectives of the Meeting, gives a selected highlight, and summarisesthe discussions that took place.
Advanced Training Course in Land Remote Sensing 2012
Objectives The objectives of this advanced Dragon training course were: To inform on past, current and future EO satellite
Advanced Training Course in Ocean Remote Sensing 2011
Background and access to current and future Chinese, ESA and TPM satellite missions in ocean remote sensing were presented
ALOS-1 ANVIR-2 Cyclic Report 07 Sep 2007
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
ALOS-1 ANVIR-2 Cyclic Report 08 Dec 2007
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
ALOS-1 ANVIR-2 Cyclic Report 09 Jun 2008
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
ALOS-1 ANVIR-2 Cyclic Report 09 Mar 2008
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
ALOS-1 ANVIR-2 Cyclic Report 09 Sep 2008
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
ALOS-1 ANVIR-2 Cyclic Report 10 Dec 2008
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
ALOS-1 ANVIR-2 Cyclic Report 12 Jun 2009
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
ALOS-1 ANVIR-2 Cyclic Report 12 Mar 2009
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
ALOS-1 ANVIR-2 Cyclic Report 12 Sep 2009
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant