Find more Data

ERS-2 GOME Spectral Product L1

Data

20 Jan 2020

DOWNLOAD DATADataset access immediately available after Fast Registration submission.

blue arrow DESCRIPTION

GOME Level 1 products contain Earthshine radiance at the Top of the Atmosphere and solar irradiance spectra. They were generated by DLR on behalf of the European Space Agency with Level 1 GOME Data Processor (GDP-L1) starting from the Extracted GOME Calibration (EGOC) Level 0 data files.

Originally raw detector signals (binary Analog to Digital Converted units) of the science measurements plus calibration constants were provided (dataset version 4 and lower), but following the end of the operational phase of the ERS-2 mission (2 July 2011), as part of ESA's post-operational algorithm improvement activities (Coldewey-Egbers et al., 2018), the GOME Level 1 data type was entirely revised and a dataset of fully calibrated and ready to use data was generated with GOME processor version 5.1. The version 5.1 data bring relevant quality improvements for the revised calibration approach, compensating aging and instrument degradation, and provide enhanced accessibility.

The version 5.1 data are in NetCDF format and differ fundamentally from the previous GOME Level 1 data, having the Envisat proprietary format and basically containing Level 1a data where a dedicated extraction software tool had to be applied by end user to obtain spectrally and radiometrically calibrated radiances (including the correction for polarisation, leakage current and stray light). Such calibrations are now applied to the version 5.1 L1b data product in the standard processing.

Users of GOME Level 1 products are strongly recommended to migrate to the latest reprocessed dataset. Please consult the GOME Product Quality Readme file before using the data. 

blue arrow DETAILS

blue arrow DATA SET SPECIFICATIONS

Digital Object Identifier (DOI): European Space Agency, 2018, GOME Level 1 Spectral Product. Version 5.1. https://doi.org/10.5270/ER2-ua38y2m

Spatial coverage: 

90 N, -90 S, -180 W, 180 E

Temporal coverage:

1995-06-28 - 2011-07-02

Starting from July 2003, products have reduced orbital coverage due to permanent failure of the ERS-2 Low Bit Rate on-board storage capability. Data could not be stored on-board any longer, and only direct transmission to on-ground receiving stations distributed over the globe was possible.

Date of launch:
1995-04-21
Operators:
ESA
Mission status:
completed
Orbit height:
782 to 785 km
Orbit type:
Sun-synchronous
Swath width:
5 km

Current Processor Version: GDP-L1 5.1

blue arrow PROCESSING LEVEL

level 1,

blue arrow APPLICABLE TERMS & CONDITIONS

Utilisation of this data is subject to ESA's Earth Observation Terms and Conditions

READ T&C

blue arrow RESOURCES

GOME Level 0 to 1 v5.1 Algorithm Theoretical Baseline Document (ATBD)
Technical Note
GOME Level 1 v5 Product User Manual (PUM)
User Manual
GOME Level 1 v5 Products Quality Readme File
Technical Note
GOME Level 1 v5 Validation Report
Technical Note
More GOME Documents
Other
Documentation related to GOME data quality
Other
Get Help ?
ESA Earth Observation User Services Portal