- All Categories (220)
- News (2)
- Missions (10)
- Events (5)
- Activities (1)
- Documents (202)
Event - Workshop
2nd Space for Hydrology Workshop
The workshop aimed to assess the current stage of knowledge and activities in space-based hydrological observations and to
Mission - Heritage Missions
AATSR Auxiliary Data
The Fourth Reprocessing is the first to use the FAST processor (v2.0.5) and so there is currently no historical information
Mission - Heritage Missions
AATSR Products Information
Third Reprocessing Dataset Information Third Reprocessing products are currently available on the NEODC archive via CEDA.
Event - Training
Advanced Training Course in Land Remote Sensing 2012
Objectives The objectives of this advanced Dragon training course were: To inform on past, current and future EO satellite
Mission - Heritage Missions
ASAR Processor Releases
August 2009 5.03L03 9 October 2009 5.04 17 September 2010 6.00 16 December 2011 6.02 30 April 2012 6.03 3 July 2015 (current
Mission - Heritage Missions
ASAR Products Information
Higher level products (Level 2) can then be derived from L1 products; however, this is currently only done with Wave mode
Document - General Reference
DRAGON 2 Programme - Brochure 2009
The Dragon Programme is a cooperation between ESA and the Ministry of Science and Technology (MOST) of the P.R. China. This brochure presents the activities undertaken since the formal start of the programme in April 2009, its background, objectives, partners and project themes.
Document - Newsletter
Earth Online Newsletter - 08 March 2024
This issue of the Earth Online Newsletter covers a selection of the latest news and events from ESA.
Document - Quality Report
Envisat ASAR Daily Report 04 Aug 2005
product. 2 - Summary 2.1 - Instrument Unavailability ASAR was unavailable due to an Antenna Reset caused by and under current
Document - Quality Report
Envisat ASAR Daily Report 04 Sep 2003
-Nominal Doppler behavior. 3 - Module Stepping Mode At creation time of the current report no new MS prodcuts are available
Document - Quality Report
Envisat ASAR Daily Report 22 Jun 2006
: EN-UNA-2006/0200 Date : 22 June 2006 ASAR Antenna Reset in accordance with procedure CRP_SYS_5041 due to TILE (E3 ) current
Document - Quality Report
Envisat ASAR Daily Report 22 May 2006
Instrument Unavailability Ref : EN-UNA-2006/0167 ASAR Antenna Reset in accordance with procedure CRP_SYS_5041 due to TILE B3 current
Document - Quality Report
Envisat ASAR Daily Report 24 Jun 2006
Ref : EN-UNA-2006/0204 Date : 24 June 2006 ASAR Antenna Reset in accordance with procedure CRP_SYS_5041 due to TILE B2 current
Document - Quality Report
Envisat ASAR Daily Report 25 May 2006
unavailability is occurred: Ref : EN-UNA-2006/0171 ASAR Antenna Reset in accordance with procedure CRP_SYS_5041 due to TILE (C1) current
Document - Quality Report
Envisat ASAR Monthly Report 01 Apr 2005
http://earth.esa.int/services/auxiliary_data/asar/current/ASA_CON_AXVIEC20041215_180008_20021017_130000_20030601_000000
Document - Quality Report
Envisat ASAR Monthly Report 01 Apr 2006
products ENVISAT ASAR MONTHLY issue 2 revision 0 - page 6 of 45 3 LOW RATE BACKGROUND REGIONAL MISSION The current
Document - Quality Report
Envisat ASAR Monthly Report 01 Apr 2007
ENVISAT ASAR MONTHLY issue 2 revision 0 - page 7 of 64 3 LOW RATE BACKGROUND REGIONAL MISSION The current
Document - Quality Report
Envisat ASAR Monthly Report 01 Apr 2008
A reprocessing activity is currently on-going.
Document - Quality Report
Envisat ASAR Monthly Report 01 Apr 2009
�� � " � � � � � � � � �#$��� � � � � �%�� � � � & � �+�� �('� 3 LOW RATE BACKGROUND REGIONAL MISSION The current
Document - Quality Report
Envisat ASAR Monthly Report 01 Apr 2010
ENVISAT ASAR MONTHLY REPORT issue 50 revision 0 page 6 of 72 3 LOW RATE BACKGROUND REGIONAL MISSION The current