- All Categories (659)
- Data (3)
- News (31)
- Missions (11)
- Events (17)
- Tools (4)
- Activities (4)
- Campaigns (1)
- Documents (588)
Document - Technical Note
(A)ATSR Expert Support Laboratory FAST Level 1b Product Definition
(A)ATSR Expert Support Laboratory FAST Level 1b Product Definition.pdf
Document - Conference Presentation - Poster
04_OCT2013_ESA-EO_programmes.pdf
ESA EO missions and their exploitation for science and applications ESA
Document - Conference Presentation - Poster
05_OCT2013 SMOS_NREUL_partI.pdf
The SMOS mission Dr. Nicolas Reul (IFREMER, France)
Document - Conference Presentation - Poster
06_OCT2013_SMOS_NREUL_partII.pdf
Ocean salinity with SMOS Dr. Nicolas Reul
Document - Conference Presentation - Poster
07_OCT2013_SMOS_Practical.pdf
BEAM practical exercises Dr. Carsten Brockmann (Brockmann Consult, Germany)
Document - Conference Presentation - Poster
10_Lopez_VAS.pdf
SMOS Validation and Retrieval Team Readiness Review Workshop 2009 Posters and Presentations - SMOS Validation Rehearsal Campaign at the VAS site (E.Lopez)
Event - Conference
2nd SMOS Science Conference
The objectives of the 2nd SMOS Science Conference were: To provide the SMOS science communities with an update on past, current
Event - Workshop
2nd Space for Hydrology Workshop
The workshop aimed to assess the current stage of knowledge and activities in space-based hydrological observations and to
Document - Technical Note
34th AATSR QWG Meeting Summary
The 34th AATSR QWG Meeting was held on 28th/29th March 2017 at RAL, Harwell, U.K. ThisMemorandum states the objectives of the Meeting, gives a selected highlight, and summarisesthe discussions that took place.
Event - Training
Advanced Training Course in Land Remote Sensing 2012
Objectives The objectives of this advanced Dragon training course were: To inform on past, current and future EO satellite
Event - Training
Advanced Training Course in Ocean Remote Sensing 2011
Background and access to current and future Chinese, ESA and TPM satellite missions in ocean remote sensing were presented
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 07 Sep 2007
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 08 Dec 2007
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 09 Jun 2008
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 09 Mar 2008
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 09 Sep 2008
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 10 Dec 2008
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 12 Jun 2009
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 12 Mar 2009
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 12 Sep 2009
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant