- All Categories (79)
- News (2)
- Missions (5)
- Events (6)
- Documents (66)
News - Thematic area articles
Space data support Earth’s ecosystems
Currently, it is not possible to measure photosynthetic activity from space, but the forthcoming FLuorescence EXplorer (FLEX
News - Thematic area articles
How satellite data help to shape society
Title: Current drought situation in Ebro basin Description: The SMOS soil-moisture-based drought monitor is updated monthly
Event - Training
EO Summer School 4
Keynote lectures on global change issues are also given to discuss the current state of the science of global change and
Event - Workshop
Space and the Arctic 2009 Workshop
possibilities for the future : Volker Liebig, Director of ESA EO Programme Observations of the Arctic - EUMETSAT's Contribution to Current
Document - General Reference
In-action-around-the-world-the-International-Charter-Space-and-Major-Disasters.pdf
This is an article extracted from the ESA Bulletin Nr.143.
Mission - Heritage Missions
PALSAR Processor Releases
The current ALOS-1 PALSAR IPF integrated within the ESA On-The-Fly system is v4.16p9, installed on 24 January 2017.
Document - Quality Report
ALOS-1 PRISM Cyclic Report 23 Jul 2007
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 PRISM Cyclic Report 08 Dec 2007
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 PRISM Cyclic Report 23 Oct 2007
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 PRISM Cyclic Report 07 Sep 2007
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 PALSAR Cyclic Report 10 Dec 2008
Checks are currently made on a weekly basis (header parameters, PDS status) to have a constant view on the mission status
Document - Quality Report
ALOS-1 PALSAR Cyclic Report 09 Mar 2008
Instrument Unavailability ........................................................................................... 9 4.3 Current
Document - Quality Report
ALOS-1 PRISM Cyclic Report 12 Mar 2009
Unplanned Instrument Unavailability..................................................................................6 3.3 Current
Document - Quality Report
ALOS-1 PRISM Cyclic Report 25 Jan 2009
Unplanned Instrument Unavailability..................................................................................6 3.3 Current
Document - Quality Report
ALOS-1 PRISM Cyclic Report 27 Apr 2009
undertaken in order to assess the ground segment, the instrument performance and the product quality Checks are currently
Document - Quality Report
ALOS-1 PRISM Cyclic Report 09 Mar 2008
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 PALSAR Cyclic Report 07 Sep 2007
Checks are currently made on a weekly (header parameters, PDS status) or bi-monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 PRISM Cyclic Report 15 Mar 2010
Current CFI is in configuration 6.4. Previous one was version 6.1.
Document - Quality Report
ALOS-1 PRISM Cyclic Report 27 Jan 2010
Unplanned Instrument Unavailability.................................................................................. 6 4.3 Current
Document - Quality Report
ALOS-1 PALSAR Cyclic Report 23 Jul 2007
Checks are currently made on a weekly (header parameters, PDS status) or bi-monthly (visual report) basis to have a constant