earth online
  • All Categories (138)
  • Data (2)
  • News (16)
  • Missions (6)
  • Events (4)
  • Tools (2)
  • Activities (4)
  • Documents (104)
  • Document - Proceedings

    prompt photo

    1st MSG RAO Workshop

    Proceedings of the workshop organised by ESA and EUMETSAT held in CNR of Bologna, Italy in May 2000.

  • Document - Conference Presentation - Poster

    prompt photo

    2-ITCG_integrated_maritime_surveillance.pdf

    Italian Coast Guard integrated maritime surveillance in the framework of security, anti-pollution and fisheries control activities Luigia Caiazzo(Italian Coast Guard, Italy)

  • Document - Conference Presentation - Poster

    prompt photo

    2_ppt_POLINSAR2013_dmonells_std.pdf

    Performance Comparison between Dual Polarimetric and Fully Polarimetric data for DInSAR Subsidence monitoring D. Monells [Universitat Politecnica de Catalunya, UPC - Spain]

  • Document - Proceedings

    prompt photo

    2nd-MSG-RAO-Workshop.pdf

    Proceedings of the 2nd MSG RAO Workshop, held on 9-10 September 2004 in Salzburg, Austria

  • Document - Proceedings

    prompt photo

    3rd-MSG-RAO-Workshop.pdf

    Proceedings of the 3rd MSG RAO Workshop held on 5 June 2006 in Helsinki, Finland

  • Document - Conference Presentation - Poster

    prompt photo

    7-Clean_Sea_Net.pdf

    The "New Generation" of CleanSeaNet: the EU Remote Sensing Based Monitoring System for Oil Spill and Vessel Detection Sonia Pellizzari (European Maritime Safety Agency)

  • Document - Technical Note

    prompt photo

    A-comparison-of-superresolution-reconstruction-methods-for-multiangle-CHRIS-Proba-images.pdf

    This paper presents the results of three superresolution methods applied to multiangular CHRIS/Proba data: three methods, namely non-uniform interpolation and de-convolution, iterative back-projection, and total variation are examined.

  • Document - Quality Report

    prompt photo

    ALOS-1 ANVIR-2 Cyclic Report 07 Sep 2007

    Unplanned Instrument Unavailability..................................................................................5 4.3 Current

  • Document - Quality Report

    prompt photo

    ALOS-1 ANVIR-2 Cyclic Report 08 Dec 2007

    Unplanned Instrument Unavailability..................................................................................5 4.3 Current

  • Document - Quality Report

    prompt photo

    ALOS-1 ANVIR-2 Cyclic Report 09 Jun 2008

    Unplanned Instrument Unavailability..................................................................................5 4.3 Current

  • Document - Quality Report

    prompt photo

    ALOS-1 ANVIR-2 Cyclic Report 09 Mar 2008

    Unplanned Instrument Unavailability..................................................................................5 4.3 Current

  • Document - Quality Report

    prompt photo

    ALOS-1 ANVIR-2 Cyclic Report 09 Sep 2008

    Unplanned Instrument Unavailability..................................................................................5 4.3 Current

  • Document - Quality Report

    prompt photo

    ALOS-1 ANVIR-2 Cyclic Report 10 Dec 2008

    Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant

  • Document - Quality Report

    prompt photo

    ALOS-1 ANVIR-2 Cyclic Report 12 Jun 2009

    Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant

  • Document - Quality Report

    prompt photo

    ALOS-1 ANVIR-2 Cyclic Report 12 Mar 2009

    Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant

  • Document - Quality Report

    prompt photo

    ALOS-1 ANVIR-2 Cyclic Report 12 Sep 2009

    Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant

  • Document - Quality Report

    prompt photo

    ALOS-1 ANVIR-2 Cyclic Report 13 Dec 2009

    Instrument Unavailability .................................................................................... 5 3.3 Current

  • Document - Quality Report

    prompt photo

    ALOS-1 ANVIR-2 Cyclic Report 15 Jun 2010

    Checks are currently made on a weekly basis (header parameters, PDS status) to have a constant view on the mission status

  • Document - Quality Report

    prompt photo

    ALOS-1 ANVIR-2 Cyclic Report 15 Mar 2010

    Current CFI is in configuration 6.4. Previous one was configuration 6.1.

  • Document - Quality Report

    prompt photo

    ALOS-1 ANVIR-2 Cyclic Report 23 Jan 2008

    Unplanned Instrument Unavailability..................................................................................5 4.3 Current