- All Categories (960)
- Data (3)
- News (3)
- Missions (2)
- Tools (1)
- Activities (1)
- Documents (950)
Document - General Reference
A-New-Earth-Explorer-The-Third-Cycle-of-Core-Earth-Explorers.pdf
This article is extracted from ESA Bulletin Nr. 131
Document - General Reference
A-Review-of-Mediterranean-Environmental-Management-Actions-Using-Space-Techniques.pdf
This document represents the executive review of the work performed by CTM (Centro di Telerilevamento Mediterraneo) and the National Observatory of Athens. This review has been promoted by ESA - EURISY Colloquium (Athens, 19-20 October 1998)
Data - Announcement of Opportunity (Restrained)
Announcement of Opportunity for S3VT (Sentinel-3 Validation Team)
In the framework of a Copernicus collaborative agreement ESA and EUMETSAT invite interested groups and individuals to support the Sentinel-3 Validation Team (S3VT).
Document - General Reference
BIOMASS-Report-for-Mission-Selection-An-Earth-Explorer-to-observe-forest-biomass.pdf
The objective of the BIOMASS Mission is to determine the global distribution of forest biomass by reducing the uncertainty in the calculation of carbon stock and fluxes associated with the terrestrial biosphere.
Mission - Copernicus Sentinels
Copernicus Sentinel-3
Copernicus Sentinel-3 is an European Earth Observation satellite mission developed to support Copernicus ocean, land, atmospheric, emergency, security and cryospheric applications.
Document - Technical Note
CUS-Software-Administrator-and-Operator-Manual.pdf
This document describes all procedures to be executed by administrators and operators in order to support correct activities of CUS facility.
Activity - Projects
Dragon 2 Cooperation Programme
The Dragon 2 Programme focussed on the exploitation of ESA, ESA's Third Party Missions and Chinese Earth observation data for science and applications development in land, ocean and atmospheric applications.
Mission - Heritage Missions
Envisat
Envisat was ESA's successor to ERS. Envisat carried ten instruments aboard for a wide range of Earth observing fields. The mission was operational from 2002 to 2012.
Data - Fast Registration with immediate access (Open)
Envisat DORIS Doppler [DOR_DOP_1P]
This product was generated by the Centre de Traitement Doris Poseidon (CTDP). The DORIS Doppler product (DOR_DOP_1P) was consolidated offline 2-4 weeks after sensing and stored in the F-PAC archive. The file size is 0.5 Mbytes per orbit.
Data - Fast Registration with immediate access (Open)
Envisat DORIS Precise Orbit [DOR_VOR_AX]
The latest version of the Envisat DORIS Precise Orbit product, DOR_VOR_AX, was generated by the Centre de Traitement Doris Poseidon (CTDP) using the Geophysical Data Records F standards (GDR-F). The product is used to obtain the satellite orbital parameters (latitude, longitude, height and height rate) by using orbit computation routines. The most significant changes related to the GDR-F standards concern the new ocean tide model (FES2014) and the updated Terrestrial Reference Frame (ITRF2014). The new standards significantly improve all Precise Orbit Determination (POD) metrics with respect to GDR-E. The mean difference and variance of Sea Surface Height (SSH) at crossovers is slightly reduced. The DOR_VOR_AX product adopts the Envisat format, and the size is 0.2 Mbytes per orbit. Users are recommended to apply the GDR-F version, but the previous datasets are still available (i.e. GDR-D and GDR-E versions). See further details in the readme file for Envisat DORIS Precise Orbit Determination files. Comparison of Envisat Sea Level Anomaly trends obtained using DORIS Precise Orbit GDR-E and F standards. North/South patterns are evident. Credits: CNES/CLS.
Document - Product Specifications
Envisat products specifications - Volume 9 - DORIS products specifications
Document - Quality Report
Envisat RA-2 MWR DORIS Daily Report 01 Apr 2008
Envisat RA-2 MWR DORIS Daily Report
Document - Quality Report
Envisat RA-2 MWR DORIS Daily Report 01 Apr 2009
Envisat RA-2 MWR DORIS Daily Report
Document - Quality Report
Envisat RA-2 MWR DORIS Daily Report 01 Aug 2007
Envisat RA-2 MWR DORIS Daily Report
Document - Quality Report
Envisat RA-2 MWR DORIS Daily Report 01 Aug 2009
Envisat RA-2 MWR DORIS Daily Report
Document - Quality Report
Envisat RA-2 MWR DORIS Daily Report 01 Dec 2007
Envisat RA-2 MWR DORIS Daily Report
Document - Quality Report
Envisat RA-2 MWR DORIS Daily Report 01 Dec 2008
Envisat RA-2 MWR DORIS Daily Report
Document - Quality Report
Envisat RA-2 MWR DORIS Daily Report 01 Feb 2008
Envisat RA-2 MWR DORIS Daily Report
Document - Quality Report
Envisat RA-2 MWR DORIS Daily Report 01 Feb 2010
Envisat RA-2 MWR DORIS Daily Report
Document - Quality Report
Envisat RA-2 MWR DORIS Daily Report 01 Jan 2008
Envisat RA-2 MWR DORIS Daily Report