- All Categories (46)
- Data (1)
- News (1)
- Missions (8)
- Events (5)
- Tools (1)
- Activities (1)
- Documents (29)
Mission - Heritage Missions
SAR (ERS) Processor Releases
It should be noted that for SAR, each product ordered is processed directly from the raw data, using the current version
Mission - Heritage Missions
SAR (ERS) Overview
Scientists are studying the radar backscatter from the ocean surface related to wind and current fronts, to eddies and to
Mission - Heritage Missions
SAR (ERS) Interferometry
addition, components of the interferometric signal such as anomalous signal path lengths introduced by atmospheric effects are currently
Mission - Heritage Missions
SAR (ERS)
Processor Releases It should be noted that for SAR, each product ordered is processed directly from the raw data, using the current
News - Thematic area articles
How ESA uses space data to explore deep Earth
Swarm maps core dynamics The swirling, conducting iron in Earth’s liquid outer core create powerful electric currents, which
Tools - Analysis
GOCE User Toolbox
Data output formats The current data formats that GUT can provide in output are: netCDF (Climate and Forecast Metadata Convention
Document - Proceedings
Fringe-2011-workshop-session-summaries.pdf
This document contains the session summaries from the session summaries of the Fringe 2011 workshop.
Document - Proceedings
Fringe-2011-workshop-recommendations.pdf
This document contains the recommendations from the session summaries of the Fringe 2011 Workshop.
Event - Workshop
Fringe 2011 Workshop
The Fringe series of workshops started in 1992 and they are currently organised by ESA every two years.
Event - Workshop
Fringe 2007 Workshop
Is it possible to uniquely identify a spatially correlated interferometric phase error due to ionosphere using current sensors
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 30 Aug 2004
Figure 6 shows the evolution of the HR calibration pulses during the current cycle.
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 29 Dec 2003
Figure 7 shows the evolution of the HR calibration pulses during the current cycle.
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 28 Mar 2005
The yaw bias has the slowly decrease to -0.3º The AMI instruments works nominally during the current cycle. 3 EXTERNAL
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 28 Apr 2003
For the current cycle its mean value is about 24.20dB with a standard deviation of 0.76dB as shown in Figure 16. 2.6
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 26 Jul 2004
Figure 9 shows the evolution of the HR calibration pulses during the current cycle.
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 26 Aug 2002
ERS-2 SAR Cyclic Report Cycle 77 3 OFFLINE SAR DATA PRODUCTS FORMAT STANDARDS This includes, for the current
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 24 Nov 2003
Figure 4 shows all patterns combined with the current VMP antenna pattern and their difference overplotted ERS-2
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 24 Mar 2003
For current cycle, the power level reaches a mean value of 40.99dB.
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 22 Jul 2002
7 of 29 s 3 DEFINITION OF PRODUCTS 3.1 Offline SAR Data Products Format Standards This includes, for the current
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 21 Jun 2004
Figure 9 shows the evolution of the HR calibration pulses during the current cycle.