earth online
  • All Categories (106)
  • Data (18)
  • News (21)
  • Missions (1)
  • Events (27)
  • Tools (5)
  • Activities (8)
  • Campaigns (1)
  • Documents (25)
  • Document - General Reference

    prompt photo

    ERS-1-FRINGE-SAR-Interferometry-Orbit-Listing-1991.pdf

    This document lists the ERS-1 SAR Interferometry orbits during the Commissioning Phase, from July to December 1991.

  • Document - General Reference

    prompt photo

    ERS-1-FRINGE-SAR-Interferometry-Orbit-Listing-1991-1992.pdf

    This document lists the ERS-1 SAR Interferometry orbits during the First Ice Phase, from December 1991 to March 1992.

  • Document - General Reference

    prompt photo

    ERS-1-FRINGE-SAR-Interferometry-Orbit-Listing-1992-1993.pdf

    This document lists the ERS-1 SAR Interferometry orbits during the Multidisciplinary Phase, from April 1992 to December 1993.

  • Document - General Reference

    prompt photo

    ERS-1-Mission-Announcement-of-Opportunity.pdf

    The ERS-1 Announcement of Opportunity for basic scientific research studies and application-oriented projects issued in 1986 resulted in approximately 250 Proposals Principal Investigators (Pl's) being accepted within the ERS-1 Science and Application Plan.

  • Document - General Reference

    prompt photo

    ERS-1-Presentation.pdf

    This brochures describes the ERS mission.

  • Document - Conference Presentation - Poster

    prompt photo

    D4P2a_Minchella_NEST_LTC2013.pdf

    D4P2a Hands on using NEST - Interferogram generation over the Etna Volcano, Italy A. Minchella, M. Foumelis

  • Document - Proceedings

    prompt photo

    EO-Summer-School-3-Satellite-radar-21st-century-glaciology.pdf

    This presentation from ESA's EO Summer School 3 describes Satellite radar – 21st century glaciology

  • Document - Proceedings

    prompt photo

    EO-Summer-School-3-Satellite-radar-21st-century-glaciology.pdf

    This presentation from ESA's EO Summer School 3 describes Satellite radar – 21st century glaciology

  • Document - Product Document

    prompt photo

    ERS-1-WSC-FDC-Product-CCT-Format.pdf

    This document deals with the Product Specifications for the WSC Fast delivery copy. Valid for data processed up until end of July '95 when there was a switch in format from CEOS to CCSDS.

  • Document - Product Document

    prompt photo

    ERS-1-WSC-DWP-Product-CCT-Format.pdf

    This document deals with the Product Specifications for the WSC de-aliased Wind Field Pressure Product.

  • Document - Product Document

    prompt photo

    Annex-E-ERS-1-ALT-WDR-Products-CCT-Format-Specifications.pdf

    This product consists of the altimeter transcribed raw data with associated immediately available calibrations, corrections, geolocation and characterisation. This product is routinely generated on receipt of altimeter data at UK-PAF.

  • Document - Product Document

    prompt photo

    ANNEX-A-ERS-1-ALT-RAW-Products-CCT-Format-Specification.pdf

    Historical Document.This document deals with the product specification of the Altimeter Raw Data Product which provides the user with annotated, uncorrected altimeter measures, sensor parameters and sensor characteristics.

  • Document - Product Document

    prompt photo

    Annex-D-ERS-1-ALT-OPR-Product-CCT-Format.pdf

    This product aims at providing the users with geophysically corrected altimeter measures over ocean, including all the engineering corrections and all the geophysical corrections due to the troposphere, the ionosphere and the electromagnetic bias. In addition, the surface altitude over the ellipsoid is calculated, correcting for the surface elevation due to tides and geoid.

  • Document - Product Document

    prompt photo

    ANNEX-B-ERS-1-ALT-FDC-Products-CCT-Format-Specifications.pdf

    This document deals with the product specification of the Altimeter Fast Delivery Copy. Valid for data processed up until July '95 when there was a switch from CEOS to CCSDS.

  • Document - Product Cal/Val Plan/Report

    prompt photo

    ERS-1-SAR-Radiometric-Calibration.pdf

    This paper describes the status of the ERS-1 SAR radiometric calibration with updated measurements on the radiometric stability. The calibration measurements arc performed using the transponders deployed by ESA/ESTEC in Flevoland, The Netherlands. The calibration measurements are the result of a joint effort between the ESA Processing and Archiving Facilities (PAF) and the ERS Central Facility at ESA/ESRIN.

  • Document - Technical Note

    prompt photo

    ERS-1-SAR-Antenna-Pattern-Estimation.pdf

    This report covers: Re-estimation of the ERS-1 antenna pattern and analysis of the way the VMP applies the antenna pattern.

  • Document - Product Readme Note

    prompt photo

    ERS-1-and-2-manoeuvres-history-since-launch.pdf

    The objective of this technical note is to give all information related to manoeuvres performed on ERS satellites since their launch on 17 July 1991 for ERS-1 and 21 April 1995 for ERS-2 up to the end of 1995.

  • Document - General Reference

    prompt photo

    ERS-1-A-keen-eye-on-the-Earth.pdf

    This document presents a brief overview of the ERS mission and the main features of the satellite and its instruments.

  • Document - Proceedings

    prompt photo

    Fringe-2011-workshop-session-summaries.pdf

    This document contains the session summaries from the session summaries of the Fringe 2011 workshop.

  • Document - General Reference

    prompt photo

    ERS-1-Ground-Segment-Acronyms-Abbreviations-and-glossary-of-terminology.pdf

    This document contains the acronyms, abbreviations and glossary of terminology for the ERS-1 project, mainly in the area of the Ground Segment.