A detailed review of the most important events impacting the quality of the ERS-2 data delivered to the user is presented in this table below, in a chronological order from its launch on 16th November 1995. The highlighted events in the table represent the major changes related to the mission configuration:

 

Year Start time Stop Time Cycle

Start

Orbit

End

Orbit

Description
  16-Nov-95 6 2991 3005 The antenna power switcher is put in an intermediate position allowing the acquisition of the first Scatterometer data.
  16-Apr-96 10 5157 5180 End of commissioning phase: calibrated data start being distributed to the users
  6-Aug-96 13 6770 6784 Due to an anomaly in the internal calibration unit, the calibration sub-system was switched from side A (nominal) to side B (redundant), causing a decrease of roughly 0.165 dB in the calibrated sigma nought
1997 30-Dec-96 3-Feb-97 18 701 706 Timeline interrupted due to payload synchronisation
1997 3-Feb-97 10-Mar-97 19 9519 9538 Advanced Microwave Instrument (AMI) WIND valid after mode change to Yaw Sterring Mode
        9794 9794 Instrument Control Unit (ICU) format error
        9795 9795 Timeline interrupted due to payload synchronisation
        9845 9845 No instrument data available.
        9850 9850 No instrument data available.
1997 10-Mar-97 14-Apr-97 20 9898 9900 Instruments Unavailability Periods
        9905 9906 Instruments Unavailability Periods
        10069 10069 Instruments Unavailability Periods
        10181 10181 Instruments Unavailability Periods
        10211 10212 TML2 not activated/LBR data missing
1997 14-Apr-97 19-May-97 21 10584 10585 Instruments Unavailability Periods
        10607 10608 Instruments Unavailability Periods
        10633 10639 Unexpected switch down to standby
        10664 10665 SPSA memory checksum violation
        10764 10768 SPSA memory checksum violation
        10862 10868 Instruments Unavailability Periods due to format counter error
1997 19-May-97 23-Jun-97 22 10877 10880 Various unavailabilities affected the first orbits of the cycle causing frequant re-synchronisations. During this period, products were not generated nominally. The calibration reference energy level is changed to compensate the decrease of the sigma nought occurred on August 1996.
        10882 10895
        10897 10909
        10911 10919
        10922 10923
        10936 10937
        10950 10952
        10965 10966
        10979 10980
        10993 10995
        11088 11089 Payload synchonisation 
        11116 11117 Instruments Unavailability Periods due to format counter error
        11223 11227 Payload anomaly
        11273 11273  Payload anomaly
        11337 11341  EQ-SOL
        11350 11356  AMI emergency S/D (Ano 220)
1997 06-Oct-97 10-Nov-97 26 13153 13160 System Error
        13254 13259 Instruments Unavailability Periods
1997 10-Nov-97 15-Dec-97 27 13439 13444 Instruments Unavailability Periods due to an ERS-2 on-board anomaly 
1998 04-May-98 08-Jun-98 32 16315 16352 Instruments Unavailability Periods e due to a depointing anomaly
1998 08-Jun-98 13-Jul-98 33 16338 16392 TC Late/TC TRAN Fail
1998 13-Jul-98 17-Aug-98 34 17265 17267 AMI in STANDBY and MCMD Refuse Mode
1998 17-Aug-98 21-Sep-98 35 17805 17805 Instruments Unavailability Periods
        17808 17810 Instruments Unavailability Periods
1998 26-Oct-98 30-Nov-98 37 18630 18630 EPC undervoltage 
        18718 18718 AMI MCMD refuse mode due to EPC undervoltage
        18740 18740 Instruments Unavailability Periods due to an ERS-2 on-board anomaly 
        18749 18749 Instruments Unavailability Periods due to an ERS-2 on-board anomaly 
        18869 18870 Instruments Unavailability Periods due to ICU Req
1999 30-Nov-98 04-Jan-99 38 18915 18915 AMI Anomaly 228  ICU 
        19208 19214 EMERGENCY SWITCH DOWN 
1999 08-Feb-99 15-Mar-99 40 20338 20338 Instruments Unavailability Periods due to an RTM counter Out-of-limit 
1999 15-Mar-99 19-Apr-99 41 20435 20435 Instruments Unavailability Periods due to an AMI ICU Memory Test 
1999 19-Apr-99 24-May-99 42 21001 21001 No instrument data available.
        21054 21054 SPSA memory checksum violation
1999 02-Aug-99 06-Sep-99 45 22610 22611 Instruments Unavailability Periods due to an ERS-2 on-board anomaly 
1999 06-Sep-99 11-Oct-99 46 22904 22905 MCMD refuse mode
        23264 23265  Emergency switch down
1999 11-Oct-99 15-Nov-99 47 23461 23464 MCMD Refuse Mode
        23608 23608 Emergency switch down
1999 15-Nov-99 20-Dec-99 48 23929 23940 ID STBY followed by switch off of all instruments
2000 24-Jan-00 28-Feb-00 50 24980 24984 PL Synchronised
        25096 25146 Due to the MONO GYRO AOCS Software implementation the PL-Instruments are unavailable.Three of the 6 on-board gyroscopes
are lost, the Mono Gyro Mode (MGM) configuration is implemented to extend the satellite lifetime by using the available gyros one at the time. As a consequence of that, scatterometer performance worsens.
2000 28-Feb-00 03-Apr-00 51 25685 25686 AMI in stand-by mode
        25706 25712 AMI unavailable
        25762 25771 Instruments Unavailability Periods due to an ERS-2 on-board anomaly 
2000 12-Jun-00 17-Jul-00 54 27157 27233 Instruments Unavailability Periods due to an ERS-2 on-board anomaly 
        27307 27314 Instruments Unavailability Periods due to an ERS-2 on-board anomaly 
2000 17-Jul-00 21-Aug-00 55 27484 27488 GOME TML2 interrupted
2000 21-Aug-00 25-Sep-00 56 27985 27989 AMI in stand-by mode
2000 25-Sep-00 30-Oct-00 57 28429 28429 Instruments Unavailability Periods due to the upload of an Attitude and Orbit Control System (AOCS)  patch
        28581 28622 Instruments Unavailability Periods due to an ERS-2 on-board anomaly 
2000 30-Oct-00 04-Dec-00 58 29047 29047 Owing to an end of wind check anomaly, AMI went to refuse mode.
        29167 29167 No instrument data available.
        29223 29224 Owing to format acquisition errors there was an emergency switch-down of Ami.
        29240 29240 Instruments Unavailability Periods due to an ERS-2 on-board anomaly 
2000 04-Dec-00 08-Jan-01 59 29530 29533 Instruments Unavailability Periods due to an ERS-2 on-board anomaly 
  17-Jan-01        After the loss of 5 of the 6 onboard gyroscopes and aiming at preserving the last one for orbital manoeuvres, the Attitude and Orbit Control System (AOCS) is switched off, entering in the so-called Zero Gyro Mode (ZGM). Because of that, strongly degraded sigma nought is recorded, leading to discontinuous data dissemination. As consequence assimilation of the ECMWF was discontinued and afterward interrupted
  08-Jan-01 12-Feb-01 60 29916 30245 Calibration through transponders is discontinued. However, data acquisition continues and its use is foreseen for the next reprocessing campaigns.
2001       30036 30038 Instruments Unavailability Periods due to spacecraft anomaly
        30043 30266 Instruments Unavailability Periods due to spacecraft anomaly
        30270 30307 RA had Instrument Data Handling and Transmission (IDHT) anomaly due to external clock.
        30318 30319 RA had Instrument Data Handling and Transmission (IDHT) anomaly due to external clock.
        30332 30333 No instrument data available.
2001 12-Feb-01 19-Mar-01 61 30467 30468 Instruments Unavailability Periods due to an ERS-2 on-board anomaly 
        30590 30596 AMI in stand-by mode
        30862 30863 No instrument data available.
2001 19-Mar-01 23-Apr-01 62 31091 31093 AMI in MCMD refused mode due to a command conflict
2001 23-Apr-01 28-May-01 63 31817 31854 IT1 Memory protection error
        31870 31871 AMI in stand-by mode
        31873 31873 AMI in stand-by mode
2001 6_Aug-01 10-Sep-01 66 33314 33315 Instruments Unavailability Periods
2001 10-Sep-01 15-Oct-01 67 33672 33673 Due to  an spacecraft anomaly the AMI went in REFUSED MODE
2001 15-Oct-01 19-Nov-01 68 34393 34418 TML STOPPED
2001 19-Nov-01 24-Dec-01 69 34430 34430 Due to the 1Gyro Coarse Mode Commissioning the whole PL was turned to Stand-by mode.
2002 28-Jan-02 04-Mar-02 71 35473 35475 Due to an SPACECRAFT anomaly the AMI went in REFUSED MODE
        35498 35506 Instruments Unavailability Periods due to a Spacecraft-Anomaly
2002 04-Mar-02 08-Apr-02 72 35973 36156 Due to an onboard anomaly all payload instruments are unavailable
2002 8-Apr-02 13-May-02 73 36593 36593 Instrument Data Handling and Transmission (IDHT) switch down
2002 13-May-02 17-Jun-02 74 37005 37005 AMI went to MCMD Refuse Mode and switched down to Heater
        37007 37007 AMI went to MCMD Refuse Mode and switched down to Heater
        37009 37011 AMI went to MCMD Refuse Mode and switched down to Heater
        37013 37077 AMI Recovering
        37234 37234 AMI in MCMD Refused mode
        37241 37241 AMI  autonomous switch down to heater and MCMD refuse mode caused by receiver overload protection
        37243 37243 AMI  autonomous switch down to heater and MCMD refuse mode because of arcing
2002 17-Jun-02 22-Jul-02 75 37494 37495 Instruments Unavailability Periods due to 228 ICU REQ anomaly
2002 22-Jul-02 26-Aug-02 76 37954 37954 Instruments Unavailability Periods due to 228 ICU REQ anomaly
        37961 37962 AMI switched down to MCMD refuse mode and HEATER
2002 26-Aug-02 30-Sep-02 77 38654 38656 TML3 stopped for Payload synchronization
2002 30-Sep-02 04-Nov-02 78 39000 39000 AMI went into refuse mode due to TC failure
2002 04-Nov-02 9-Dec-02 79 39633 39646 Payload unavailable due to Leonid operations.
        39723 39724 AMI in MCMD Refuse Mode/HEATER Mode.
2002 9-Dec-02 13-Jan-03 80 39935 39939 Instrument Data Handling and Transmission (IDHT) is in stand-by
2003 13-Jan-03 17-Feb-03 81 40918 40918 No instrument data available.
        40922 40922 No instrument data available.
2003 17-Feb-03 24-Mar-03 82 40982 40988 Restore power and timeline
        41111 41112 RA is recovered from SPSA
2003 24-Mar-03 28-Apr-03 83 41645 41647 AMI in Sttand-by and Refuse  mode
        41848 41848 AMI went to MCMD Refuse Mode and switched down to Heater
2003 28-Apr-03 2-Jun-03 84 41960 41961 Instrument Data Handling and Transmission (IDHT) Tape Recorder B Maintenance
        42190 42239 PRARE NOMINAL
        42254 42254 PRARE NOMINAL
2003 2-Jun-03 7-Jul-03 85 42722 42738 High Rate was unavailable
        42749 42849  Failure of the on-board tape recorder: no data available
        42867 42867  Resumption of RT LR downlink + HR downlink,  using TR B                  
        42866 42866 Return to HR only downlink
  17-Jul-03       The Instrument Data Handling and Transmission (IDHT) system configuration is modified to permit the data transmission every time the satellite is within the visibility of an acquisition station. New ground stations are gradually added to maximize the data coverage. Currently, the operative ground stations are Beijing (CN), Chetumal (MX), Gatineau (CDN), Hobart (AUS), Kiruna (S), Maspalomas (E), Matera (I), McMurdo (Antarctica), Miami (US), Singapore, and West Freugh (UK). 
  21-Aug-03       The ERS-2 Scatterometer Attitude Corrected Algorithm (ESACA) is included in the processing chain to compensate for the switching off of the AOCS.
  7-Jul-03 11-Aug-03 86 42941 43072 Payload switch-off
        43103 43112 I/O error on tape
        43177 43184 I/O error on tape
        43294 43298 I/O error on tape
2003 15-Sep-03 20-Oct-03 88 44090 44091  AMI autonomous switch down to heater mode.
        44438 44440 AMI went down to MACRO CMD IHIBITED
2003 20-Oct-03 24-Nov-03 89 44776 44781 AMI in standby/mcmd inhibit after emergency shut down.
  1-Mar-04 31-Mar-04       Assimilation of ERS-2 scatterometer data by ECMWF is resumed
2004 8-Mar-04 12-Apr-04 93 46882 46883 Instruments Unavailability Periods due to AMI stand-by
2004 17-May-04 21-Jun-04 95 47506 47544 Instruments Unavailability Periods due to AMI was in refuse mode 
        47568 47568  Instruments Unavailability Periods due to wrong Instrument Data Handling and Transmission (IDHT) status
        47803 47803 Instruments Unavailability Periods due to Instrument Data Handling and Transmission (IDHT) unavailable 
2004 21-Jun-04 26-Jul-04 96 47960 47962 Instruments Unavailability Periods due to HP arcing 
2004 30-Aug-04 4-Oct-04 98 49296 49303 AMI was recovered from Standby Mode after an emergency switch-down 
2004 13-Dec-04 17-Jan-05 101 50497 50504 AMI unavailable due to incorrect execution of ICU memory test procedure
        50629 50654 Instrument Data Handling and Transmission (IDHT) returned to MPS. 
        50655 50655 AMI temporarily unavailable for PL SYNC of RA.
        50656 50669 AMI is Back to MPS due to on-board anomaly
2005 17-Jan-05 21-Feb-05 102 51030 51037 AMI back to MPS after emergency switch down to MCMD  EXECUTION
        51102 51106 AMI back to MPS after emergency switch down to MCMD EXECUTION INHIBITED.
2005 21-Feb-05 28-Mar-05 103 51517 51523 AMI in  STANDBY / MCMD EXEC  INHIBIT. Due an EMERGENCY SWITCH DOWN
        51711 51711 AMI back to operations after switchdown to Heater MCMD/Refuse mode caused by a gap mode
2005 2-May-05 6-Jun-05 105 52759 52770 AMI Back to MPS
2005 6-Jun-05 11-Jul-05 106 53161 53168 Emergency switch down of AMI to Standby and Inhibited status due to RBI Status error
2005 15-Aug-05 19-Sep-05 108 54403 54405 AMI is in Standby / MCMD Refused mode due to a 228 ICU REQ anomaly
2005 19-Sep-05 24-Oct-05 109 54589 54591 AMI in Standby / MCMD Execution Inhibited
        54957 54959 AMI returned to MPS after STANDBY/MCMD Execution inhibited
2005 24-Oct-05 28-Nov-05 110 55320 55323 Due to an onboard anomaly, all instruments are in standby mode except PRARE which is off
2005 28-Nov-05 2-Jan-06 111 55533 55535 AMI in Standby / MCMD Execution Inhibited
2006 2-Jan-06 6-Feb-12 112 56073 56075 ATSR ICU Reset
        56213 56216 AMI in Standby/MCMD inhibited
2006 6-Feb-06 13-Mar-06 113 56778 56779 Emergency Switch Down of AMI to Standby due to RBI Status error
2006 13-Mar-06 17-Apr-06 114 57435 57436 AMI in Heater/MCMD refused, due to incorrect execution of PL SYNC
2006 26-Jun-06 31-Jul-06 117 58480 58482  AMI Switchdown to STANDBY ICU RUNNING due to commanding conflict during RA recovery
        58531 58533 AMI in  STANDBY / MCMD REFUSE MODE / ICU RUNNING
2006 31-Jul-06 4-Sep-06 118 59279 59280 Payload in Standby (with PRARE OFF) due to wrong MCMD time-tag
        59320 59322 Instrument Data Handling and Transmission (IDHT) Switchdown to Standby / MCMD Execution Inhibited
2006 4-Sep-06 9-Oct-06 119 59712 59712 AMI is in Standby / MCMD Refused mode due to a 228 ICU REQ anomaly
2006 13-Nov-06 18-Dec-06 121 60829 60833 AMI Switchdown to Standby / MCMD Execution Inhibited due to Format Acquisition Error
2007 22-Jan-07 26-Feb-07 123 61701 61701 AMI Switchdown to Standby / MCMD Refuse Mode due to 228 ICU REQ
        61896 61896 AMI Switchdown to Heater / MCMD Refuse Mode due to HPA Arcing
2007 7-May-07 11-Jun-07 126 63191 63193 AMI Switchdown to Standby / MCMD Execution Inhibited due to Format Acquisition Error
        63455 63459 AMI Switchdown to Standby/MCMD Execution Inhibited due to Format Length and ICU Begin Identifier Errors
2007 11-Jun-07 16-Jul-07 127 63483 63488 AMI Switchdown to Standby/MCMD Execution Inhibited due to Emergency Switchdown requested by AMI ICU 
2007 16-Jul-07 20-Aug-07 128 64013 64017 AMI Emergency Switchdown to Standby/MCMD Execution Inhibited due to RBI Status Error 
        64136 64137 AMI in HEATER/MCMD REFUSED Mode due to TC FAILED at End of Wind Mode
2008 20-Aug-07 24-Sep-07 129 64624 64632 AMI Switchdown to Heater / MCMD Refuse Mode due to HPA Arcing    
  1-Oct-07 29-Oct-07 130 65072 65485 Due to the better coverage of the Rain Forest, the antenna pattern calibration, suspended in June 2003, is resumed.
        65136 65137 AMI Switchdown to Heater / MCMD Refuse Mode due to HPA Arcing      
  29-Oct-07 3-Dec-07 131 65644 65644 AMI Switchdown to Heater / MCMD Refuse Mode due to HPA Arcing       
  3-Dec-07 7-Jan-08 132 66161 66163 AMI Switchdown to Heater / MCMD Refuse Mode due to HPA Arcing     
  7-Jan-08 11-Feb-08 133 66628 66636 AMI Switchdown to Heater / MCMD Refuse Mode due to HPA Arcing
        66639 66640 AMI Switchdown to Heater / MCMD Refuse Mode due to HPA Arcing
        66646 66646 AMI Switchdown to Heater / MCMD Refuse Mode due to HPA Arcing
        66662 66664 AMI Switchdown to Heater / MCMD Refuse Mode due to HPA Arcing
        66891 66899 AMI Switchdown to Standby/MCMD Execution Inhibited due to Format Length and ICU Begin Identifier Errors
2008 17-Mar-08 21-Apr-08 135 67886 67888 AMI Switchdown to Standby/MCMD Execution Inhibited due to Format Length and ICU Begin Identifier Errors
2008 21-Apr-08 26-May-08 136 68112 68112 AMI Switchdown to Standby / MCMD Refuse Mode due to 228 ICU REQ
2008 26-May-08 30-Jun-08 137 68780 68784 AMI Switchdown to Standby/MCMD Execution Inhibited due to Format Length and ICU Begin Identifier Errors
        68845 68846 AMI Emergency Switchdown to Standby/MCMD Execution Inhibited due to RBI Status Error
2008 30-Jun-08 4-Aug-08 138 69363 69365 AMI Switchdown to Standby / MCMD Refuse Mode due to 228 ICU REQ.
2008 4-Aug-08 8-Sep-08 139 69553 69553 RA Switchdown to WUP1 + SPSA ON / MCMD Refused
        69556 69558 RA Switchdown to WUP1 + SPSA ON / MCMD Refused
        69810 69827 GOME unpowered due to FPA1 temperature
        69881 69888 AMI Switchdown to Standby
2008 13-Oct-08 17-Nov-08 141 70520 70522 GOME unpowered
        70609 70610 RA Switchdown to WUP1 + SPSA ON / MCMD Refused
2009 26-Jan-09 2-Mar-09 144 72193 72194 AMI Switchdown to Standby
2009 2-Mar-09 6-Apr-09 145 72841 72841 GOME unpowered 
2009 6-Apr-09 11-May-09 146 73007 73007 AMI Switchdown to Standby / MCMD Refuse
2009       73065 73065 AMI Switchdown to Heater / MCMD Refuse
2009       73117 73121 RA Switchdown to WUP1+SPSA ON / MCMD Refused 
2009 11-May-09 15-Jun-09 147 73515 73515 RA Switchdown to WUP1+SPSA ON / MCMD Refused 
        73517 73517 RA Switchdown to WUP1+SPSA ON / MCMD Refused 
        73536 73536 RA Switchdown to WUP1+SPSA ON / MCMD Refused 
        73613 73617 RA recovered from  WUP1 + SPSA ON / MCMD Refused
        73658 73660 GOME unpowered due to RTM LATCH up conter out of limit
        73664 73665 GOME unpowered due to RTM LATCH up conter out of limit
        73675 73682 AMI Switchdown to Standby
        73792 73794 RA Switchdown to WU1 + SPSA ON / MCMD Refused
        73848 73849 RA Emergency Switchdown after Format Counter Error
2009 20-Jul-09 24-Aug-09 149 74554 74554 RA Switchdown to WUP1+SPSA ON / MCMD Refused      
        74705 74710 AMI Switchdown to Standby / MCMD Refuse Mode due to concurrent 216 MCD ERR and 228 ICU REQ  
        74754 74755 AMI switched to HEATER/REF  due to  COMMAND REJECTION 
        74785 74785 GOME unpowered 
        74935 74939 AMI EQ-SOL , MCMD /REF due to  Anomaly 228 ICU REQ 1500 0082
        74996 74997 AMI Switchdown to Standby / MCMD Refuse Mode due to 228 ICU REQ
2009 24-Aug-09 28-Sep-09 150 75155 75157 AMI Switchdown to Standby / MCMD Refuse Mode
        75228 75242 AMI in Heater/MCMD Refused Mode due to End of Wind Anomaly 
        75259 75260 Payload Synchronisation
2009 28-Sep-09 2-Nov-09 151 75543 75543 RA Switchdown to WUP1+SPSA ON / MCMD REFUSE  
        75669 75669 AMI switched to HEATER/REF  due to  COMMAND failure
        75715 75719 GOME unavailable to due payload synchronisation
2010 11-Jan-10 15-Feb-10 154 77046 77047 AMI Switchdown to Standby 
        77275 77278 RA Emergency Switchdown to  Standby
        77287 77288 RA Emergency Switchdown to  Standby
        77411 77417 AMI Emergency Switchdown to Standby
2010 15-Feb-10 22-Mar-10 155 77684 77684 RA Emergency Switchdown due to wrong RBI STATUS
        77791 777964 RA Emergency Switchdown after Format Counter Error
2010 26-Apr-10 31-May-10 157 78921 78933 RA  EMERGENCY  SWITCHDOWN / AMI in STANDBY
2010 5-Jul-10 9-Aug-10 159 79668 79669 AMI in Heater/Refuse due to Gap mode time out
  1-Sep-10 30-Sep-10 160/161 80331 80760 "Calibration Mode" is removed from the satellite orbital planning and substituted by nominal acquisition.
2010 22-Nov-10 27-Dec-10 163 81974 81980 Instrument Data Handling and Transmission (IDHT) back to operations following a Switchdown to Standby 
2011 27-Dec-10 31-Jan-11 164 82159 82160 RA back to operations.
  22-Feb-11       ERS-2 orbit is lowered by a series of orbit manoeuvres. As a consequence of that, the repeat cycle changes from 35 to the 3 day
  22-Jul-11       ERS-2 decommissioning is foreseen

 

Minimize Scatterometer Links
Minimize Scatterometer Documentation