- All Categories (38)
- News (2)
- Missions (1)
- Events (1)
- Tools (1)
- Activities (1)
- Documents (32)
Document - General Reference
The Earth from ALOS - New Perspectives from Space including 3D
This brochure gives an example of the ALOS spectacular scenes, 3D pictures and general info on the satellite applications.
News - Events and Proceedings
National missions in the spotlight at the Living Planet Symposium
two sessions tomorrow, Thursday 26 May, to introduce attendees to the profusion of national Earth observation missions currently
Document - General Reference
Meteosat-Second-Generation.pdf
This flyer summarises in short the aims, applications and technology of the MSG mission.
Document - General Reference
Meteosat-Second-Generation-The-Satellite-Development.pdf
This publication provides a comprehensive overview of the history of the MSG programme, the mission objectives, the design and development of the MSG spacecraft.
Tools - Visualisation
HEDAVI
ESA’s Heritage EO data currently cover more than 30 years of observations and enable the analysis of spatio-temporal dynamics
Activity - Projects
Dragon 3 Cooperation Programme
Surveying and Mapping China Mirjam Bilker-Koivula, Hannu Ruotsalainen Finnish Geodetic Institute Finland 10677 - GSM4GCM Current
Document - General Reference
CoReH2O-Report-for-Mission-Selection-An-Earth-Explorer-to-observe-snow-and-ice.pdf
This report describes the CoReH2O (Cold Regions Hydrology high-resolution Observatory) mission, which was selected for feasibility study in the third cycle of Earth Explorers.
Document - General Reference
BIOMASS-Report-for-Mission-Selection-An-Earth-Explorer-to-observe-forest-biomass.pdf
The objective of the BIOMASS Mission is to determine the global distribution of forest biomass by reducing the uncertainty in the calculation of carbon stock and fluxes associated with the terrestrial biosphere.
Document - Quality Report
ALOS-1 PRISM Cyclic Report 29 Apr 2010
Checks are currently made on a weekly basis (header parameters, PDS status) to have a constant view on the mission status
Document - Quality Report
ALOS-1 PRISM Cyclic Report 28 Oct 2009
Unplanned Instrument Unavailability..................................................................................6 4.3 Current
Document - Quality Report
ALOS-1 PRISM Cyclic Report 28 Jul 2009
Unplanned Instrument Unavailability..................................................................................6 4.3 Current
Document - Quality Report
ALOS-1 PRISM Cyclic Report 27 Jan 2010
Unplanned Instrument Unavailability.................................................................................. 6 4.3 Current
Document - Quality Report
ALOS-1 PRISM Cyclic Report 27 Apr 2009
undertaken in order to assess the ground segment, the instrument performance and the product quality Checks are currently
Document - Quality Report
ALOS-1 PRISM Cyclic Report 25 Oct 2008
Checks are currently made on a weekly basis (header parameters, PDS status) to have a constant view on the mission status
Document - Quality Report
ALOS-1 PRISM Cyclic Report 25 Jul 2008
� 3 SOFTWARE & AUX FILE VERSION CONFIGURATION Current Optical Processor Version ESRIN Matera Tromso 4.05 09/
Document - Quality Report
ALOS-1 PRISM Cyclic Report 25 Jan 2009
Unplanned Instrument Unavailability..................................................................................6 3.3 Current
Document - Quality Report
ALOS-1 PRISM Cyclic Report 24 Apr 2008
Unplanned Instrument Unavailability..................................................................................6 4.3 Current
Document - Quality Report
ALOS-1 PRISM Cyclic Report 23 Oct 2007
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 PRISM Cyclic Report 23 Jul 2007
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 PRISM Cyclic Report 23 Jan 2008
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant