- All Categories (44)
- Data (1)
- Missions (8)
- Events (4)
- Activities (1)
- Documents (30)
Mission - Heritage Missions
SAR (ERS) Processor Releases
It should be noted that for SAR, each product ordered is processed directly from the raw data, using the current version
Mission - Heritage Missions
SAR (ERS) Overview
Scientists are studying the radar backscatter from the ocean surface related to wind and current fronts, to eddies and to
Mission - Heritage Missions
SAR (ERS) Interferometry
addition, components of the interferometric signal such as anomalous signal path lengths introduced by atmospheric effects are currently
Mission - Heritage Missions
SAR (ERS)
Processor Releases It should be noted that for SAR, each product ordered is processed directly from the raw data, using the current
Document - Proceedings
Fringe-2011-workshop-session-summaries.pdf
This document contains the session summaries from the session summaries of the Fringe 2011 workshop.
Document - Proceedings
Fringe-2011-workshop-recommendations.pdf
This document contains the recommendations from the session summaries of the Fringe 2011 Workshop.
Event - Workshop
Fringe 2011 Workshop
The Fringe series of workshops started in 1992 and they are currently organised by ESA every two years.
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 30 Aug 2004
Figure 6 shows the evolution of the HR calibration pulses during the current cycle.
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 29 Dec 2003
Figure 7 shows the evolution of the HR calibration pulses during the current cycle.
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 28 Mar 2005
The yaw bias has the slowly decrease to -0.3º The AMI instruments works nominally during the current cycle. 3 EXTERNAL
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 28 Apr 2003
For the current cycle its mean value is about 24.20dB with a standard deviation of 0.76dB as shown in Figure 16. 2.6
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 26 Jul 2004
Figure 9 shows the evolution of the HR calibration pulses during the current cycle.
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 26 Aug 2002
ERS-2 SAR Cyclic Report Cycle 77 3 OFFLINE SAR DATA PRODUCTS FORMAT STANDARDS This includes, for the current
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 24 Nov 2003
Figure 4 shows all patterns combined with the current VMP antenna pattern and their difference overplotted ERS-2
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 24 Mar 2003
For current cycle, the power level reaches a mean value of 40.99dB.
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 22 Jul 2002
7 of 29 s 3 DEFINITION OF PRODUCTS 3.1 Offline SAR Data Products Format Standards This includes, for the current
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 21 Jun 2004
Figure 9 shows the evolution of the HR calibration pulses during the current cycle.
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 21 Feb 2005
The mean replica power level is of 49.84dB for the current cycle. 13 ERS-2 SAR Cyclic Report Cycle 103
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 17 May 2004
Figure 7 shows the evolution of the HR calibration pulses during the current cycle.
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 17 Jun 2002
7 of 24 s 3 DEFINITION OF PRODUCTS 3.1 Offline SAR Data Products Format Standards This includes, for the current