Minimize Browse SPPA Document Library
« Back

SCIAMACHY Operations Concept III. Instrument States and Onboard Tables (PFM)

This Technical Note (TN) is the third volume in the trilogy of the SCIAMACHY Operation Concept TNs describing the basic knowledge about SCIAMACHY operations planning. It served prior to launch as input to the development of the ENVISAT ground segment, in particular to those systems that are required for mission planning and timelining. 

 

REFERENCE
PO-TN-DLR-SH-0001/3  
FORMAT
pdf  
ISSUE
Issue 5, Rev. 0  
DATE
10 April 2018
AUTHORSHIP
 
PAGES
 
KEYWORDS
envisat, sciamachy, sost
TYPE
Technical Note  
Link