Minimize Browse SPPA Document Library
« Back

SCIAMACHY Operations Concept II. Timelines: Generation, Planning & Execution Rules and Reference Timelines

This Technical Note (TN) is the second volume in the trilogy of the SCIAMACHY Operation Concept TNs describing the basic knowledge about SCIAMACHY operations planning. It serves as input to the development of the ENVISAT ground segment, in particular to those systems that are required for mission planning and scheduling. 

REFERENCE
PO-TN-DLR-SH-0002/1  
FORMAT
pdf  
ISSUE
Issue 3 Rev. 0  
DATE
10 April 2018
AUTHORSHIP
SCIAMACHY Operations Support Team  
PAGES
 
KEYWORDS
envisat, sciamachy, sost
TYPE
Technical Note  
Link