Minimize GRACE News

GRACE operational issue: Switch-on of Microwave Assemblies

25 February 2014

Following the planned switch-off of the GRACE-A and -B Microwave Assemblies (MWA) for battery load reduction (see related news of 23 January 2014), both MWAs have been switched-on again on the below dates:

  • 21 February 2014, 07:06 UTC: GRACE-A MWA
  • 23 February 2014, 07:14 UTC: GRACE-B MWA