Analysis from 02-APR-2012 00:00:00 to 02-APR-2012 23:59:59. Page generated on 03-APR-2012 06:31:44.
View log file: ASAR_Daily_Report_20120403_0631.log. For any anomalies please contact emma.hatton@vegaspace.com, kajal.haria@vegaspace.com.

This report is automatically generated every day, every 2 hours. No comments are provided on the results.

SUMMARY

 1.  DATA SUMMARY
    1.1  Summary tables
    1.2  Lists of products used

 2.  AUXILIARY FILES ANALYSIS
    2.1  IECF operational ADFs list
    2.2  Products with wrong ADFs

 3.  MODULE STEPPING PRODUCTS ANALYSIS
    3.1  V/V polarisation
    3.2  H/H polarisation

 4.  CALIBRATION PULSES ANALYSIS
    4.1  Analysis for WVS IS2 V/V
        4.1.1  Temporal Evolution Analysis for WVS IS2 V/V
        4.1.2  All Rows Analysis for WVS IS2 V/V
    4.2  Analysis for GM1 SS3 H/H
        4.2.1  Temporal Evolution Analysis for GM1 SS3 H/H
        4.2.2  All Rows Analysis for GM1 SS3 H/H

 5.  DOPPLER ANALYSIS
    5.1  Analysis for WVS IS2 V/V
        5.1.1  Doppler MAP Analysis for WVS IS2 V/V
        5.1.2  Doppler ANX Analysis for WVS IS2 V/V
    5.2  Analysis for GM1 SS1 H/H
        5.2.1  Doppler MAP Analysis for GM1 SS1 H/H
        5.2.2  Doppler ANX Analysis for GM1 SS1 H/H
    5.3  Doppler JUMPS Analysis for WSM

 6.  CHIRP ANALYSIS
    6.1  Analysis for WSM SS1 H/H
        6.1.1  ScaleFactor
    6.2  Analysis for WSM SS1 V/V
        6.2.1  ScaleFactor

 7.  RAW DATA ANALYSIS
    7.1  Analysis for WVS
    7.2  Analysis for IMM

 8.  TELEMETRY ANALYSIS
    8.1  Number of Missing Lines
    8.2  Number of Gaps


1 - DATA SUMMARY

1.1 - Summary tables

[ BACK TO MENU ]

WVS
CenterBeamPol#
PDEIS1V/V1
PDEIS2V/V28
PDKIS2V/V24
GM1
CenterBeamPol#
PDEWSH/H31
PDKWSH/H47
APM
CenterBeamPol#
PDEIS1V/H3
PDEIS1V/V2
PDEIS2H/H1
PDEIS2V/H1
PDEIS2V/V1
PDEIS4H/H1
PDEIS4H/V1
PDEIS7H/H1
PDKIS1V/H1
PDKIS3H/H1
PDKIS4H/H1
IMM
CenterBeamPol#
PDEIS2V/V2
PDEIS3V/V1
PDEIS6H/H3
PDKIS2V/V1
PDKIS5H/H1
WSM
CenterBeamPol#
PDEWSH/H32
PDEWSV/V7
PDKWSH/H11
PDKWSV/V1
MS
CenterTimePolModules
PDK2012-04-02 15:14:04H320
PDK2012-04-02 16:54:18V320

1.2 - Lists of products used

[ BACK TO MENU ]

[TXT] [XLS] List_WVS_products_used
[TXT] [XLS] List_GM1_products_used
[TXT] [XLS] List_APM_products_used
[TXT] [XLS] List_IMM_products_used
[TXT] [XLS] List_WSM_products_used
[TXT] [XLS] List_MS_products_used


2 - AUXILIARY FILES ANALYSIS

2.1 - IECF operational ADFs list

[ BACK TO MENU ]

ADFs disseminated for ASAR
ASA_CON_AXVIEC20110526_075001_20101027_215740_20141231_000000
ASA_INS_AXVIEC20110124_114858_20101228_112000_20141231_235959
ASA_XCH_AXVIEC20101222_143057_20020301_000000_20141231_000000
ASA_XCA_AXVIEC20120126_110323_20110607_000000_20141231_000000

2.2 - Products with wrong ADFs

[ BACK TO MENU ]

ProductASA_CONASA_INSASA_XCHASA_XCA
WVS0000
GM10000
APM0000
IMM0000
WSM0000

[TXT] [XLS] Check_ADFs_WVS
[TXT] [XLS] Check_ADFs_GM1
[TXT] [XLS] Check_ADFs_APM
[TXT] [XLS] Check_ADFs_IMM
[TXT] [XLS] Check_ADFs_WSM


3 - MODULE STEPPING PRODUCTS ANALYSIS

3.1 - V/V polarisation

[ BACK TO MENU ]

SECOND FIXED REFERENCEPREVIOUS PRODUCT REFERENCE
Pre-launch reference (2001-02-09)Previous product in the same polarisation

3.2 - H/H polarisation

[ BACK TO MENU ]

SECOND FIXED REFERENCEPREVIOUS PRODUCT REFERENCE
Pre-launch reference (2001-02-09)Previous product in the same polarisation


4 - CALIBRATION PULSES ANALYSIS

4.1 - Analysis for WVS IS2 V/V

4.1.1 - Temporal Evolution Analysis for WVS IS2 V/V
[ BACK TO MENU ]


Rows: [2/6/10/14/18/22/26/30] [3/7/11/15/19/23/27/31] [4/8/12/16/20/24/28/32]


Rows: [2/6/10/14/18/22/26/30] [3/7/11/15/19/23/27/31] [4/8/12/16/20/24/28/32]

4.1.2 - All Rows Analysis for WVS IS2 V/V
[ BACK TO MENU ]

4.2 - Analysis for GM1 SS3 H/H

4.2.1 - Temporal Evolution Analysis for GM1 SS3 H/H
[ BACK TO MENU ]


Rows: [2/6/10/14/18/22/26/30] [3/7/11/15/19/23/27/31] [4/8/12/16/20/24/28/32]


Rows: [2/6/10/14/18/22/26/30] [3/7/11/15/19/23/27/31] [4/8/12/16/20/24/28/32]

4.2.2 - All Rows Analysis for GM1 SS3 H/H
[ BACK TO MENU ]



5 - DOPPLER ANALYSIS

5.1 - Analysis for WVS IS2 V/V

5.1.1 - Doppler MAP Analysis for WVS IS2 V/V
[ BACK TO MENU ]

5.1.2 - Doppler ANX Analysis for WVS IS2 V/V
[ BACK TO MENU ]

5.2 - Analysis for GM1 SS1 H/H

5.2.1 - Doppler MAP Analysis for GM1 SS1 H/H
[ BACK TO MENU ]

5.2.2 - Doppler ANX Analysis for GM1 SS1 H/H
[ BACK TO MENU ]

5.3 - Doppler JUMPS Analysis for WSM
[ BACK TO MENU ]



6 - CHIRP ANALYSIS

6.1 - Analysis for WSM SS1 H/H

6.1.1 - ScaleFactor
[ BACK TO MENU ]

6.2 - Analysis for WSM SS1 V/V

6.2.1 - ScaleFactor
[ BACK TO MENU ]



7 - RAW DATA ANALYSIS

7.1 - Analysis for WVS

[ BACK TO MENU ]

ChannelStatisticsDSS-B
MEAN Imean0.000654606
stdev1.15253e-07
MEAN Qmean0.000488024
stdev 1.95488e-07
ChannelStatisticsDSS-B
STDEV Imean0.155458
stdev0.00136138
STDEV Qmean0.156070
stdev 0.00139130

7.2 - Analysis for IMM

[ BACK TO MENU ]

ChannelStatisticsDSS-B
MEAN Imean0.000285072
stdev5.19423e-09
MEAN Qmean0.000561904
stdev 5.75097e-09
ChannelStatisticsDSS-B
STDEV Imean0.0713902
stdev0.000544681
STDEV Qmean0.0716897
stdev 0.000550743


8 - TELEMETRY ANALYSIS

Processing CenterProduct GapsMissing lines
PDE ASA_WVS_1PNPDE20120402_002645_000004203113_00174_52774_8660.N1 0 40
PDE ASA_WVS_1PNPDE20120402_012651_000002593113_00175_52775_8682.N1 0 8
PDE ASA_WVS_1PNPDE20120402_020756_000001653113_00175_52775_8690.N1 1 0
PDE ASA_WVS_1PNPDE20120402_031626_000005393113_00176_52776_8713.N1 1 0
PDE ASA_WVS_1PNPDE20120402_064312_000002243113_00178_52778_8800.N1 1 0
PDE ASA_WVS_1PNPDE20120402_220931_000003453113_00187_52787_8996.N1 1 0
PDK ASA_WVS_1PNPDK20120402_102819_000019343113_00180_52780_6741.N1 0 8
PDK ASA_WVS_1PNPDK20120402_122551_000005833113_00181_52781_6789.N1 0 8
PDK ASA_WVS_1PNPDK20120402_205645_000000593113_00187_52787_6973.N1 0 8
PDE ASA_WSM_1PNPDE20120402_030519_000003363113_00176_52776_8706.N1 0 1

8.1 - Number of Missing lines

[ BACK TO MENU ]

8.2 - Number of Gaps

[ BACK TO MENU ]



ASAR Daily Report V1.00
Document Reference: OSME-DPQC-SEDA-RP-06-0348/0349
Contract Reference: ESA/Esrin 19049/05/I-OL
All rights reserved to Serco S.p.A., Via XX Settembre, 1 - 00187 Roma - Italy.
In particular, but not limited to:
(a) Modification, reverse engineering or distribution is not permitted in any form.
(b) Usage is restricted to Serco S.p.A. employee belonging to the above Contract Reference.
Any deviation from above rules requires an explicit prior written authorisation of Serco S.p.A.