- All Categories (198)
- Data (1)
- News (5)
- Missions (3)
- Events (12)
- Tools (1)
- Activities (5)
- Documents (171)
Event - Meeting
VH-RODA and CEOS SAR workshop
The workshop provided an open forum for the presentation and discussion of current status and future developments related
Event - Meeting
PROBA-V QWG meeting 13
The latest delay in the schedule of the PV-CC launch (currently Q1/Q2 2022) changed the approach for exploitation, notably
Event - Meeting
PROBA-V QWG meeting 10
During the meeting the review of current mission performance focused on calibration and on the assessment of impact of the
Activity - Instrument characterisation and algorithm studies
ESA satellites and instruments calibration landing page
Data Outages: Information currently not available online.
Event - Workshop
SEASAR 2012
Aouf 14:00 - 14:20 Towards consistent inversion of wind, waves and surface current from SAR Bertrand Chapron (IFREMER, France
Event - Meeting
PROBA-V QWG meeting 9
During the current meeting these options will be reviewed more in details and final recommendations from the QWG will be
Event - Meeting
PROBA-V QWG meeting 16
The main topics of the meeting were recalled with summary of current status and open points for discussion: Mission Status
Activity - Instrument characterisation and algorithm studies
PV-LAC-ATMO
The current operational Atmospheric Correction applied to Proba-V TOA observations (Sterckx et al. 2014) uses the Simplified
Document - Proceedings
SEASAR-2012-sessions-summaries-seed-questions-recommendations.pdf
This document gathers together the sessions summaries with seed questions discussion and recommendations of the SEASAR 2012 workshop.
Document - General Reference
PROBA-V-QWG-10-Report-Summary.pdf
This report provides a summary of PROBA-V QWG meeting 10.
Document - Publication - Paper
cloud_detection_FUB.pdf
Proba-V Cloud Detection Round Robin Meeting document
Document - Technical Note
PV-LAC-ATMO-scientific-roadmap-activity-2.pdf
PV-LAC-ATMO Scientific Roadmap – Activity 2
Event - Meeting
PROBA-V QWG meeting 12
The initial schedule has drifted due to shift in launch date of 1st PV-CC (VNIR), currently set during Aug-Nov 2021.
Event - Meeting
PROBA-V QWG meeting 14
The main topics of the meeting were recalled with summary of current status and open points for discussion: Mission Status
Document - General Reference
PV-LAC-COAST-SR-v1.1.pdf
In the frame of the PV-LAC project a prototype code has been developed, tested and validated for the atmospheric correction (A/C) and turbidity retrieval of PROBA-V data over turbid coastal areas.