earth online
  • All Categories (181)
  • Data (1)
  • News (7)
  • Missions (7)
  • Events (8)
  • Activities (5)
  • Documents (153)
  • Event - Meeting

    prompt photo

    VH-RODA and CEOS SAR workshop

    The workshop provided an open forum for the presentation and discussion of current status and future developments related

  • Event - Meeting

    prompt photo

    PROBA-V QWG meeting 13

    The latest delay in the schedule of the PV-CC launch (currently Q1/Q2 2022) changed the approach for exploitation, notably

  • Data - EO Sign In Authentication (Open)

    prompt photo

    Landsat 8 Collection 2 European Coverage

    terrain corrections applied and resampled for registration to a cartographic projection, referenced to the WGS84, G873, or current

  • Activity - Quality

    prompt photo

    EDAP

    The following missions are currently being considered as part of the Automatic Identification System (AIS) and Radio Frequency

  • Event - Meeting

    prompt photo

    PROBA-V QWG meeting 10

    During the meeting the review of current mission performance focused on calibration and on the assessment of impact of the

  • Event - Workshop

    prompt photo

    IDEAS+ Cal/Val Workshop 7

    Regular workshops are held every nine months with the whole IDEAS+ Task 3-Cal/Val team in order to review the status of current

  • News - Thematic area articles

    prompt photo

    How satellite data help to shape society

    Title: Current drought situation in Ebro basin Description: The SMOS soil-moisture-based drought monitor is updated monthly

  • Event - Meeting

    prompt photo

    PROBA-V QWG meeting 9

    During the current meeting these options will be reviewed more in details and final recommendations from the QWG will be

  • Event - Meeting

    prompt photo

    PROBA-V QWG meeting 16

    The main topics of the meeting were recalled with summary of current status and open points for discussion: Mission Status

  • News - Data Release news

    prompt photo

    New Landsat-8 Collection-2 Level 1 and Level 2 data now available

    The Online Dissemination service is still being populated, with the current availability of Collection-2 data as follows:

  • Activity - Quality

    SLAP

    Currently, in excess of 701,000 Level 1 TM and 84,000 Level 1 ETM+ products have been reprocessed and released under the

  • Activity - Instrument characterisation and algorithm studies

    PV-LAC-ATMO

    The current operational Atmospheric Correction applied to Proba-V TOA observations (Sterckx et al. 2014) uses the Simplified

  • Document - General Reference

    prompt photo

    PROBA-V-QWG-10-Report-Summary.pdf

    This report provides a summary of PROBA-V QWG meeting 10.

  • Document - Technical Note

    prompt photo

    Proba-V Cal-Val Plan IQC-GC

  • Document - Technical Note

    prompt photo

    Proba-V QWG5 - Introduction

  • Event - Meeting

    prompt photo

    PROBA-V QWG meeting 12

    The initial schedule has drifted due to shift in launch date of 1st PV-CC (VNIR), currently set during Aug-Nov 2021.

  • Mission - Earth Watch

    prompt photo

    TIRS Product Anomalies

    artifacts, how they are addressed and corrected, and provides up-to-date information and details regarding known issues and current

  • Mission - Earth Watch

    prompt photo

    Vegetation (VGT) Quality Control Reports

    months and provide information about: Absolute and inter-band radiometric accuracy Multi-temporal radiometric accuracy Dark current