- All Categories (44)
- Data (1)
- Missions (8)
- Events (4)
- Activities (1)
- Documents (30)
Document - Proceedings
Fringe-2011-workshop-session-summaries.pdf
This document contains the session summaries from the session summaries of the Fringe 2011 workshop.
Data - Fast Registration with immediate access (Open)
ERS PRARE Precise Orbit Product (ERS.ORB.POD/ERS.ORB/PRC)
Several orbit solutions are currently distributed: A new set of ORB POD (Precise Orbit Determination - REAPER v2) computed
Event - Workshop
Fringe 2011 Workshop
The Fringe series of workshops started in 1992 and they are currently organised by ESA every two years.
Mission - Heritage Missions
SAR (ERS)
Processor Releases It should be noted that for SAR, each product ordered is processed directly from the raw data, using the current
Mission - Heritage Missions
ERS Overview
global scale, the two ERS satellites expanded our understanding of the interaction between the oceans and atmosphere, ocean currents
Document - Proceedings
Fringe-2011-workshop-recommendations.pdf
This document contains the recommendations from the session summaries of the Fringe 2011 Workshop.
Mission - Heritage Missions
SAR (ERS) Overview
Scientists are studying the radar backscatter from the ocean surface related to wind and current fronts, to eddies and to
Mission - Heritage Missions
SAR (ERS) Processor Releases
It should be noted that for SAR, each product ordered is processed directly from the raw data, using the current version
Mission - Heritage Missions
SAR (ERS) Interferometry
addition, components of the interferometric signal such as anomalous signal path lengths introduced by atmospheric effects are currently
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 06 Jun 2005
The mean replica power level is of 49.45dB for the current cycle. 12 ERS-2 SAR Cyclic Report Cycle 106
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 17 Jan 2005
The yaw bias has the slowly decrease to -0.3º No instrument switch-off during the current cycle. 3 EXTERNAL CALIBRATION
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 21 Feb 2005
The mean replica power level is of 49.84dB for the current cycle. 13 ERS-2 SAR Cyclic Report Cycle 103
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 28 Mar 2005
The yaw bias has the slowly decrease to -0.3º The AMI instruments works nominally during the current cycle. 3 EXTERNAL
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 02 May 2005
For the current cycle, the power level is of 48.68dB as shown in Figure 11.
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 09 Dec 2002
For the current cycle its mean value is about 24.335 dB with a standard deviation of 0.773 dB as shown in Figure 18. 2.6
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 02 Jun 2003
For the current cycle its mean value is about 24.18dB with a standard deviation of 0.75 dB as shown in Figure 16. 2.6
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 26 Aug 2002
ERS-2 SAR Cyclic Report Cycle 77 3 OFFLINE SAR DATA PRODUCTS FORMAT STANDARDS This includes, for the current
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 08 Nov 2004
Figure 10 shows the trend evolution of the HR calibration pulses during the current cycle.
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 24 Nov 2003
Figure 4 shows all patterns combined with the current VMP antenna pattern and their difference overplotted ERS-2
Document - Quality Report
ERS-2 AMI-SAR Cyclic Report 13 Dec 2004
For the current cycle, the power level is of 48.89dB as shown in Figure 4.