earth online
  • All Categories (44)
  • Data (1)
  • Missions (8)
  • Events (4)
  • Activities (1)
  • Documents (30)
  • Document - Proceedings

    prompt photo

    Fringe-2011-workshop-session-summaries.pdf

    This document contains the session summaries from the session summaries of the Fringe 2011 workshop.

  • Data - Fast Registration with immediate access (Open)

    prompt photo

    ERS PRARE Precise Orbit Product (ERS.ORB.POD/ERS.ORB/PRC)

    Several orbit solutions are currently distributed: A new set of ORB POD (Precise Orbit Determination - REAPER v2) computed

  • Event - Workshop

    prompt photo

    Fringe 2011 Workshop

    The Fringe series of workshops started in 1992 and they are currently organised by ESA every two years.

  • Mission - Heritage Missions

    prompt photo

    SAR (ERS)

    Processor Releases It should be noted that for SAR, each product ordered is processed directly from the raw data, using the current

  • Mission - Heritage Missions

    prompt photo

    ERS Overview

    global scale, the two ERS satellites expanded our understanding of the interaction between the oceans and atmosphere, ocean currents

  • Document - Proceedings

    prompt photo

    Fringe-2011-workshop-recommendations.pdf

    This document contains the recommendations from the session summaries of the Fringe 2011 Workshop.

  • Mission - Heritage Missions

    prompt photo

    SAR (ERS) Overview

    Scientists are studying the radar backscatter from the ocean surface related to wind and current fronts, to eddies and to

  • Mission - Heritage Missions

    prompt photo

    SAR (ERS) Processor Releases

    It should be noted that for SAR, each product ordered is processed directly from the raw data, using the current version

  • Mission - Heritage Missions

    prompt photo

    SAR (ERS) Interferometry

    addition, components of the interferometric signal such as anomalous signal path lengths introduced by atmospheric effects are currently

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 06 Jun 2005

    The mean replica power level is of 49.45dB for the current cycle. 12 ERS-2 SAR Cyclic Report Cycle 106

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 17 Jan 2005

    The yaw bias has the slowly decrease to -0.3º No instrument switch-off during the current cycle. 3 EXTERNAL CALIBRATION

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 21 Feb 2005

    The mean replica power level is of 49.84dB for the current cycle. 13 ERS-2 SAR Cyclic Report Cycle 103

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 28 Mar 2005

    The yaw bias has the slowly decrease to -0.3º The AMI instruments works nominally during the current cycle. 3 EXTERNAL

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 02 May 2005

    For the current cycle, the power level is of 48.68dB as shown in Figure 11.

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 09 Dec 2002

    For the current cycle its mean value is about 24.335 dB with a standard deviation of 0.773 dB as shown in Figure 18. 2.6

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 02 Jun 2003

    For the current cycle its mean value is about 24.18dB with a standard deviation of 0.75 dB as shown in Figure 16. 2.6

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 26 Aug 2002

    ERS-2 SAR Cyclic Report Cycle 77 3 OFFLINE SAR DATA PRODUCTS FORMAT STANDARDS This includes, for the current

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 08 Nov 2004

    Figure 10 shows the trend evolution of the HR calibration pulses during the current cycle.

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 24 Nov 2003

    Figure 4 shows all patterns combined with the current VMP antenna pattern and their difference overplotted ERS-2

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 13 Dec 2004

    For the current cycle, the power level is of 48.89dB as shown in Figure 4.