- All Categories (617)
- Data (1)
- News (18)
- Missions (12)
- Events (16)
- Activities (3)
- Campaigns (1)
- Documents (566)
News - Operational News
SMOS data distribution resumed
SMOS data distribution to end users was resumed on 12 March 2024 after confirmation of the adequate quality of the current
Event - Workshop
2nd Space for Hydrology Workshop
The workshop aimed to assess the current stage of knowledge and activities in space-based hydrological observations and to
News - General News
Go-to guide to Third Party Mission data offering
Data Access Guide has been published, providing technical details and information on available data collections for all current
Event - Meeting
VH-RODA and CEOS SAR workshop
The workshop provided an open forum for the presentation and discussion of current status and future developments related
Event - Meeting
PROBA-V QWG meeting 13
The latest delay in the schedule of the PV-CC launch (currently Q1/Q2 2022) changed the approach for exploitation, notably
News - Success Stories
Satellite data predicts lower wheat crop yield
Title: Current drought situation in Ebro basin Description: The SMOS soil-moisture-based drought monitor is updated monthly
Event - Meeting
PROBA-V QWG meeting 10
During the meeting the review of current mission performance focused on calibration and on the assessment of impact of the
Event - Workshop
IDEAS+ Cal/Val Workshop 7
Regular workshops are held every nine months with the whole IDEAS+ Task 3-Cal/Val team in order to review the status of current
Mission - Earth Explorers
SMOS product availability
+ NIR + Long LO + FTT LO + Electrical Stability LO + NIR + Long + FTT LO + Short LO + Long + Short Current
News - Thematic area articles
How satellite data help to shape society
Title: Current drought situation in Ebro basin Description: The SMOS soil-moisture-based drought monitor is updated monthly
News - General News
ESA's excellent Earth Explorer missions extended to 2025
Acting like the spinning conductor in a bicycle dynamo, it generates electrical currents and thus the continuously changing
Event - Training
EO Summer School 4
Keynote lectures on global change issues are also given to discuss the current state of the science of global change and
Mission - Heritage Missions
PALSAR
A small percentage of ALOS-1 PALSAR products processed by the current installed ESA IPF are affected by a known quality issue
Mission - Heritage Missions
PALSAR Processor Releases
The current ALOS-1 PALSAR IPF integrated within the ESA On-The-Fly system is v4.16p9, installed on 24 January 2017.
News - Events and Proceedings
SMOS data advances space weather and ionospheric research
Title: Tracking the solar activity cycle using SMOS data Description: This graph shows the “rise” of our current solar activity
Event - Meeting
PROBA-V QWG meeting 9
During the current meeting these options will be reviewed more in details and final recommendations from the QWG will be
News - Operational News
SMOS data outage since 22 February 2024
spacecraft has been back in nominal mode since 25 February and on 27 February, the MIRAS instrument was switched on and is currently
Event - Meeting
PROBA-V QWG meeting 16
The main topics of the meeting were recalled with summary of current status and open points for discussion: Mission Status
Activity - Instrument characterisation and algorithm studies
PV-LAC-ATMO
The current operational Atmospheric Correction applied to Proba-V TOA observations (Sterckx et al. 2014) uses the Simplified