earth online
  • All Categories (229)
  • News (5)
  • Missions (10)
  • Events (9)
  • Activities (5)
  • Documents (200)
  • News - General News

    prompt photo

    Go-to guide to Third Party Mission data offering

    Data Access Guide has been published, providing technical details and information on available data collections for all current

  • Event - Meeting

    prompt photo

    VH-RODA and CEOS SAR workshop

    The workshop provided an open forum for the presentation and discussion of current status and future developments related

  • Event - Meeting

    prompt photo

    PROBA-V QWG meeting 13

    The latest delay in the schedule of the PV-CC launch (currently Q1/Q2 2022) changed the approach for exploitation, notably

  • Activity - Quality

    prompt photo

    EDAP

    The following missions are currently being considered as part of the Automatic Identification System (AIS) and Radio Frequency

  • Event - Meeting

    prompt photo

    PROBA-V QWG meeting 10

    During the meeting the review of current mission performance focused on calibration and on the assessment of impact of the

  • Mission - Heritage Missions

    prompt photo

    PALSAR

    A small percentage of ALOS-1 PALSAR products processed by the current installed ESA IPF are affected by a known quality issue

  • Mission - Heritage Missions

    prompt photo

    PALSAR Processor Releases

    The current ALOS-1 PALSAR IPF integrated within the ESA On-The-Fly system is v4.16p9, installed on 24 January 2017.

  • Event - Meeting

    prompt photo

    PROBA-V QWG meeting 9

    During the current meeting these options will be reviewed more in details and final recommendations from the QWG will be

  • Activity - Quality

    SLAP

    Currently, in excess of 701,000 Level 1 TM and 84,000 Level 1 ETM+ products have been reprocessed and released under the

  • Event - Meeting

    prompt photo

    PROBA-V QWG meeting 16

    The main topics of the meeting were recalled with summary of current status and open points for discussion: Mission Status

  • Document - General Reference

    prompt photo

    PROBA-V-QWG-10-Report-Summary.pdf

    This report provides a summary of PROBA-V QWG meeting 10.

  • Activity - Instrument characterisation and algorithm studies

    PV-LAC-ATMO

    The current operational Atmospheric Correction applied to Proba-V TOA observations (Sterckx et al. 2014) uses the Simplified

  • Document - Technical Note

    prompt photo

    Proba-V Cal-Val Plan IQC-GC

  • Document - General Reference

    prompt photo

    The Earth Observation Handbook, 2010 Update - Key Tables

    This is the 2010 update of the CEOS Earth Observation Handbook. You can browse the live database at http://database.eohandbook.com/ or download the printable PDF of key tables based on the 2010 database contents for a handy reference.

  • Document - Technical Note

    prompt photo

    Proba-V QWG5 - Introduction

  • Event - Meeting

    prompt photo

    PROBA-V QWG meeting 12

    The initial schedule has drifted due to shift in launch date of 1st PV-CC (VNIR), currently set during Aug-Nov 2021.

  • Document - Technical Note

    prompt photo

    Proba-V Cal-Val Plan IQC

  • Mission - Earth Watch

    prompt photo

    Vegetation (VGT) Quality Control Reports

    months and provide information about: Absolute and inter-band radiometric accuracy Multi-temporal radiometric accuracy Dark current