earth online
  • All Categories (42)
  • News (2)
  • Missions (7)
  • Events (1)
  • Activities (1)
  • Documents (31)
  • Activity - Quality

    SCIRoCCo

    Author: The SCIRoCCo Team Abstract: The ERS Scatterometers in the Global Climate Observing System report describes the current

  • Mission - Heritage Missions

    prompt photo

    SAR (ERS) Processor Releases

    It should be noted that for SAR, each product ordered is processed directly from the raw data, using the current version

  • Mission - Heritage Missions

    prompt photo

    SAR (ERS)

    Processor Releases It should be noted that for SAR, each product ordered is processed directly from the raw data, using the current

  • News - Data Release news

    prompt photo

    New reprocessing of datasets celebrates 30 years of ERS

    For each surface, the experts will use our current knowledge acquired over 30 years of experience, to improve the ERS altimetric

  • Mission - Heritage Missions

    prompt photo

    ERS Radar Course 1

    Therefore, microwaves easily penetrate clouds, and images can be acquired independently of the current weather conditions

  • Document - Proceedings

    prompt photo

    ERS-Envisat Symposium

  • Document - Proceedings

    prompt photo

    1st MSG RAO Workshop

    Proceedings of the workshop organised by ESA and EUMETSAT held in CNR of Bologna, Italy in May 2000.

  • Event - Training

    prompt photo

    Advanced Training Course in Ocean Remote Sensing 2011

    Background and access to current and future Chinese, ESA and TPM satellite missions in ocean remote sensing were presented

  • Document - Proceedings

    prompt photo

    2004 Envisat and ERS Symposium

    The 2004 Envisat and ERS Symposium was held in Salzburg - Austria from 6 to 10 September 2004. The 2004 Envisat and ERS Symposium provided a forum for investigators to present results of ongoing research project activities and assess the development of applications and services.

  • Document - General Reference

    prompt photo

    2013 Dragon 3 Brochure

    The 2013 Dragon 3 cooperation brochure presents the activities undertaken since the formal start of programme in June 2012.

  • Mission - Heritage Missions

    prompt photo

    SAR (ERS) Interferometry

    addition, components of the interferometric signal such as anomalous signal path lengths introduced by atmospheric effects are currently

  • News - Thematic area articles

    prompt photo

    Transforming space data into climate action

    By combining high-quality data from both current and previous missions, scientists are improving their understanding of the

  • Mission - Heritage Missions

    prompt photo

    SAR (ERS) Overview

    Scientists are studying the radar backscatter from the ocean surface related to wind and current fronts, to eddies and to

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 24 Mar 2003

    For current cycle, the power level reaches a mean value of 40.99dB.

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 06 Jun 2005

    The mean replica power level is of 49.45dB for the current cycle. 12 ERS-2 SAR Cyclic Report Cycle 106

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 28 Mar 2005

    The yaw bias has the slowly decrease to -0.3º The AMI instruments works nominally during the current cycle. 3 EXTERNAL

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 17 Jan 2005

    The yaw bias has the slowly decrease to -0.3º No instrument switch-off during the current cycle. 3 EXTERNAL CALIBRATION

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 13 Jan 2003

    For the current cycle its mean value is about 24.2892dB with a standard deviation of 0.77221 dB as shown in Figure 20.

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 28 Apr 2003

    For the current cycle its mean value is about 24.20dB with a standard deviation of 0.76dB as shown in Figure 16. 2.6

  • Document - Quality Report

    prompt photo

    ERS-2 AMI-SAR Cyclic Report 17 May 2004

    Figure 7 shows the evolution of the HR calibration pulses during the current cycle.