THEMATIC AREA
INSTRUMENT TYPE
MISSION
  • Aeolus
  • ALOS-1
  • Aura
  • Biomass
  • COSMO-SkyMed
  • CryoSat
  • Deimos
  • Deimos-1
  • Deimos-2
  • DMC First Generation
  • EarthCARE
  • Envisat
  • ERS
  • ERS-1
  • ERS-2
  • FLEX
  • GeoEye-1
  • GOCE
  • GOSAT
  • GRACE
  • ICEYE
  • IKONOS-2
  • IRS-1C
  • IRS-1D
  • IRS-P5
  • IRS-P6
  • IRS-R2
  • JERS-1
  • KOMPSAT-2
  • Landsat
  • Landsat-1
  • Landsat-2
  • Landsat-3
  • Landsat-4
  • Landsat-5
  • Landsat-7
  • Landsat-8
  • Metop
  • MSG
  • NOAA
  • OceanSat-2
  • ODIN
  • PAZ
  • PlanetScope
  • Pleiades
  • PROBA-1
  • PROBA-V
  • QuickBird-2
  • RADARSAT
  • RADARSAT-1
  • RADARSAT-2
  • RapidEye
  • SCISAT-1
  • Seasat
  • SkySat
  • SMOS
  • Spire
  • SPOT
  • SPOT 1
  • SPOT 2
  • SPOT 3
  • SPOT 4
  • SPOT 5
  • SPOT 6
  • SPOT 7
  • Swarm
  • TanDEM-X
  • TerraSAR-X
  • WorldView
  • WorldView-1
  • WorldView-2
  • WorldView-3
INSTRUMENT

Search items

  • Mission - Earth Explorers, Heritage Missions

    Mission - Earth Explorers, Heritage Missions

    GOCE

    ESA's Gravity field and Ocean Circulation Explorer (GOCE) mission mapped Earth's geoid very accurately, opening a window into Earth's interior structure as well as the currents circulating within the depths of its oceans. 

  • Data - Data Download

    Data - Data Download

    GOCE Online Dissemination Service

    Download data from the GOCE mission through the ESA GOCE Online Dissemination Service. The data is freely available without registration.

  • Document - General Reference

    1 Mar 2019

    Document - General Reference

    Towards the Definitive Space Gravity Mission

    This article appeared on the International WOCE Newsletter, issue nr. 33 published on December 1998.

  • Document - Software Verification Plan/Report

    1 Mar 2019

    Document - Software Verification Plan/Report

    GUT The covhsmp and covhs2p software - User's guide

    This User's guide describes the COVHSMP and COVHS2P softwarevariance-covariance error matrix computation.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Note on GOCE Instruments Positioning

    This Memo describes positioning of GOGEs LRR, GPS Antenna and on the relative positioning of STR to Gradiometer.

  • Document - General Reference

    1 Mar 2019

    Document - General Reference

    GOCE - Mission Overview and Early Results

    These slides describe the status report at December 2009 on theGOCE mission, and were presented at the Fall Meeting of theAmerican Geophysical Union, 14-18 December 2009 in San Francisco,USA.

  • Document - General Reference

    1 Mar 2019

    Document - General Reference

    The GOCE gradiometer - instrument status, data processing and product performance

    These slides describe the status report at December 2009 on the GOCE mission, and were presented at the Fall Meeting of the American Geophysical Union, 14-18 December 2009 in San Francisco, USA.

  • Document - General Reference

    1 Mar 2019

    Document - General Reference

    Status and Performance of the GOCE Satellite

    These slides describe the status report at December 2009 on the GOCE mission, and were presented at the Fall Meeting of the American Geophysical Union, 14-18 December 2009 in San Francisco, USA.

  • Document - Proceedings

    1 Mar 2019

    Document - Proceedings

    Gradiometer On-Orbit Calibration Procedure Analysis

    The purpose of this technical note is to describe and analyse themethods defined for the on-orbit calibration of the GOCEGradiometer, to identify their performances, limitations, andimpacts on the system.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    GOCE High Level Processing Facility - Alternative method for rotation to TRF

    The purpose of this report is to assess the performance of thepoint-wise rotation as compared to the baseline method. Whether thealternative method will be used in the operational chain, dependson the trade-off between the GG accuracy in the MBW and thegeographically correlated errors. This will be studied using ESAE2E Test Data.

  • Document - Product Cal/Val Plan/Report

    1 Mar 2019

    Document - Product Cal/Val Plan/Report

    GOCE Calibration & Validation Plan for L1b Data Products

    The purpose of this document is to provide a framework for theactivities planned in connection with the calibration andvalidation of Level 1b data products from the GOCE mission. Itcontains information on the overall context for GOCE-relatedcalibration and validation, together with a summary of each of theplanned activities, including information about their goals,methodology and their outputs, as well as a list of participants.The objective of documenting each specific effort is to identifyeach expected contribution to either calibration or validation ofLevel 1b products, in order to fully appreciate what areas arecovered by existing plans, and whether further attention to detailmay be required.

  • Document - Product Document

    1 Mar 2019

    Document - Product Document

    GOCE Level 1b Products User Handbook

    The purpose of this document is to provide a detailed descriptionof the GOCE Level 1b products generated by Instrument ProcessingFacility (IPF1) and distributed to GOCE users. The documentdescribes everything required to make use of the Level 1b productsfor the processing or application and is a selfstanding documentfor what regards Level 1b products user. For a complete review ofGOCE products, please refer also to GOCE Level 2 Data Handbookavailable on this library.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Performance Requirements and Budgets for the Gradiometric Mission

    The purpose of this document is to provide a description of the GOCE gravimetric reference mission and of the reference gravity gradient tensor (GGT) model for the performance analysis; to provide an end-to-end analysis of the GGT measurement process; to provide the classification of the error sources of affecting the measurement of the GGT; to allocate performance requirements to the identified error sources through the apportionment of the assigned toplevel gradiometric performance requirement; to define the procedure for the compilation of the error budget for the measurement of the GGT; to provide the error budget for the measurement of the GGT (diagonal and off-diagonal components).

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    GOCE Mission Requirements Document

    The purpose of this document is to define the mission objectivesand scientific requirements of the GOCE mission and to provideguidelines for the technical implementation of the mission. Thedocument is divided into 7 chapters addressing the scientificbackground of the mission (chapter 2), the objectives of GOCE(chapter 3), the observation requirements (chapter 4), the missionelements (chapter 5), the mission products (chapter 6), and theconcluding remarks (chapter 7). The instrument specifications andcritical items are included in Annex 1 and Annex 2.

  • Document - Software Verification Plan/Report

    1 Mar 2019

    Document - Software Verification Plan/Report

    GUTS Final Report - GOCE User Toolbox Specifications (GUTS)

    The goal of this document is to summarize the main results of GUTSWP2000, WP3000 WP4000 and WP5000 in one single conclusive document.

  • Document - Software Verification Plan/Report

    5 Jan 2009

    Document - Software Verification Plan/Report

    GUT Standards and Recommended Models

    The document aims to develop the standards for processing altimetry and the derivation of MSS models. The standards will contain guidelines on selection of geodetic coordinate systems,tidal system, IB-correction, averaging period, format, etc. In addition, a list of available MSS models will be made.

  • Document - General Reference

    1 Mar 2019

    Document - General Reference

    Reports from Mission Selection - The Four Candidate Earth Explorer Core Missions

    The Living Planet Programme document (ESA SP-1227, available on this Library) describes the plans for the Agency's new strategy for Earth Observation in the post-2000 time frame. Out of the nine Earth Explorer Core Missions identified in 1996, four Core Missions were selected for Phase-A studies, which began in 1998, namely: the Gravity Field and Steady-State Ocean Circulation Mission; the Land-Surface Processes and Interaction Mission; the Earth Radiation Mission; and the Atmospheric Dynamics Mission. The 4 volumes forming this Special Publication describe in detail each single mission.

  • Document - Proceedings

    1 Mar 2019

    Document - Proceedings

    3rd International GOCE User Workshop

    Proceedings of the Third International GOCE User Workshop held from 6-9- November 2006 in Frascati, Italy

  • Document - Software Verification Plan/Report

    1 Mar 2019

    Document - Software Verification Plan/Report

    GUT2 WP8000- Toolbox promo package and Scientific paper

    GUTS Phase 3: GUT Development and Supporting Scientific Studies

  • Document - Software Verification Plan/Report

    27 Mar 2007

    Document - Software Verification Plan/Report

    Summary and Tutorial Document - GOCE User Toolbox Specifications (GUTS)

    WP5000: This document provides an executive summary of the GOCE User Toolbox Study.