- All Categories (4968)
- Data (17)
- News (21)
- Missions (1)
- Events (30)
- Tools (3)
- Activities (7)
- Campaigns (1)
- Documents (4888)
Document - General Reference
WATS - Water Vapour and Temperature in the Troposphere and Stratosphere.pdf
This report describes the WATS mission, one of the candidate Earth Explorers in the second cycle in 2001.
Document - General Reference
ERSIS-European-Remote-Sensing-Information-Service.pdf
This document describes the ERSIS (European Remote Sensing Information Service) concept and defines what this entails.
Document - Proceedings
Fourth-International-Symposium-on-Space-Mission-Operations-and-Ground-Data-Systems.pdf
The proceedings from Space Ops num. 96, which took place in Munich, Germany, from 16 to 20 September 1996, are presented here in three volumes:
Document - Proceedings
Dragon-2-Programme-Mid-Term-Results-2008-2010.pdf
Proceedings of the 2010 Dragon Symposium held from 17-21 May 2010 in Guilin City, P.R. China.
Document - Proceedings
First-Sentinel-2-Preparatory-Symposium.pdf
Proceedings of the First Sentinel-2 Preparatory Symposium held on 23-27 April 2012 in ESA-ESRIN, Frascati, Italy.
Document - Product Document
GOME-Ozone-Fast-Delivery-and-value-added-products-Algorithm-Specification-Document.pdf
This document describes the algorithms used for calibration the ERS GOME Ozone Fast Delivery products.
Document - Product Document
Products-Naming-Standard-Convention.pdf
This document is the proposal for the naming convention applicable to the ESA generated products.
Document - Product Cal/Val Plan/Report
Calibration-of-the-GOME-instrument-for-ERS-2.pdf
This document describes the calibration processes for the GOME (Global Ozone Monitoring Experiment) instrument aboard ERS-2.
Document - Product Cal/Val Plan/Report
ERS-2-OPR-Product-Validation-Report.pdf
This report focuses on the inspection of the OPR products and the associated user documentation.
Document - Product Cal/Val Plan/Report
GOME-Ozone-Fast-Delivery-and-value-added-products-Validation-Document.pdf
This document gives an overview of the results of the validation of the ERS GOME Fast Delivery level 2 data (vertical ozone columns). Validation is an important part of the the GOFAP project and involves the assessing of the quality of the Fast Delivery vertical ozone columns by independent means and provides an estimate of the random and systematic errors.
Document - Product Cal/Val Plan/Report
ERS2-MWR-survey-2001.pdf
Reports on activities performed in 2001 on the ERS2 / MWR survey.
Document - Product Cal/Val Plan/Report
CEOS-Working-Group-Calibration-and-Validation.pdf
This document describes the Committee on Earth Observation Satellite's involvement in Calibration and Validation activities for Earth Observation satellites.
Document - Product Cal/Val Plan/Report
CEOS-Committee-on-Earth-Observation-Satellites-Working-Group-on-Calibration-and-Validation.pdf
International collaboration on calibration and validation through the CalNal Working Group has been one of the signal successes of the CEOS organisation. The Working Group has created a mechanism for the sharing of effort in CALN AL between cooperating agencies, for the management of coherent programmes and campaigns and for the pooling of engineering and scientific information about the process of Earth observation through a variety of techniques. The success of the meeting of the SAR subgroup reported here is further evidence of the success of the coordinated approach adopted through CEOS.
Document - Technical Note
WALES - Water Vapour Lidar Experiment in Space
This report describes the WALES mission, one of the candidate Earth Explorers in the second cycle in 2001.
Document - Product Readme Note
Global-Ozone-Monitoring-Experiment-(GOME)-Interim-Science-Report.pdf
To obtain final confidence in the scientific validity of the GOME for its inclusion in the ERS-2 mission, in 1993 the Agency asked a group of scientists to review the scientific objectives and capabilities of the GOME. This 'historical' report covers the scientific rationale and objectives of GOME and assesses its capabilities.
Document - Technical Note
GOME-Software-Databases-for-Level-1-to-2-Processing.pdf
This technical note contains summary descriptions of the climatological and spectroscopic databases required for the execution of the GOME Level 1 to 2 Data Processing Chain.
Document - Technical Note
Telemeter-Instrumentation-Schedule-LMSC-No-1241637.pdf
This Telemetry Instrumentation Schedule contains a listing and channel assignment of all data processed by the Satellite Vehicle System (SVS) data system. A brief description of the telemetry format is included.
Document - Technical Note
GOME-Diffuser-and-Dark-Signal-Trends-June-1995-June-2002.pdf
This document provides an analysis of the GOME diffuser plate stability and the detector array dark signal measurements during time period June 1995 - June 2002.
Document - Technical Note
GOME-1-calibration-Lamp-anomaly-investigation.pdf
This study examines an anomaly which developed in the cathode gas discharge lamp in the GOME instrument aboard ERS-2 during calibration.
Document - Technical Note
Long-Term-Monitoring-of-GOME-Diffuser-Reflectivity-and-Dark-Signal-Analysis-v2.pdf
This document provides an update on the diffuser degradation analysis of the GOME instrument aboard ERS-2, using the monthly calibration data from June 1995 and August 2001.