Active filters:
Clear filters
THEMATIC AREA
INSTRUMENT TYPE
MISSION
INSTRUMENT
  • AATSR
  • ACC
  • ACE-FTS
  • AIRSAFE
  • ALADIN
  • AMI/SAR
  • AMI/Scatterometer
  • ASAR
  • ASCAT
  • ASM
  • ATLID
  • ATSR-1
  • ATSR-2
  • AVHRR
  • AVNIR-2
  • AwiFS
  • BBR
  • BGI
  • CER
  • CHRIS
  • CPR
  • CZCS
  • DORIS
  • EFI
  • EGG
  • EOC
  • ETM
  • FAI
  • FLORIS
  • GERB
  • GIS
  • GOME
  • GOME-2
  • GOMOS
  • GPSR
  • GRACE ACC
  • GRACE INTERFEROMETER
  • GRACE LRR
  • GRACE SCA
  • HiRAIS
  • HiRI
  • HIRS/2
  • HRC
  • HRG
  • HRS
  • HRV
  • HRVIR
  • IASI
  • IRM
  • LISS-3
  • LISS-4
  • LRR
  • LRR
  • MAESTRO
  • MERIS
  • MGF
  • MHS
  • MIPAS
  • MIRAS
  • MODIS
  • MSI
  • MSS
  • MWR
  • NAOMI
  • NMS
  • OCM-2
  • OLI
  • OMI
  • OPS
  • OSA
  • OSIRIS
  • PALSAR
  • PAN
  • PlanetScope Imager
  • PRARE
  • PRISM
  • RA
  • RA2/MWR
  • RRI
  • SAR
  • SCIAMACHY
  • SeaWiFS
  • SeaWinds
  • SEI
  • SENSE
  • SEVIRI
  • SIRAL
  • SkySat Camera
  • SLIM6
  • SMR
  • SSTI
  • Star Tracker
  • STR
  • STRATOS
  • TANSO-CAI
  • TANSO-FTS
  • TIRS
  • TM
  • TSX-1
  • VFM
  • VGT
  • WIF
  • WV1
  • WV6
  • X-SAR
Relevance
Relevance
Newest First
Oldest First
A-Z
Z-A
All Documents Types
All Documents Types
Algorithms Theoretical Baseline Document
Availability Report
Campaign Report
Conference Presentation - Poster
Data Access Information
Detailed Processing Model
Frequently Asked Questions
General Reference
Input Output Data Definition
Mission Status Report
Newsletter
Proceedings
Product Cal/Val Plan/Report
Product Document
Product Handbook
Product Readme Note
Product Specifications
Publication - Paper
Quality Report
Software Verification Plan/Report
Technical Note
User Guide

OTHER RESOURCES

Browse through mission documentation and reports, and learn more about European Space Agency Earth Observation projects and opportunities.

Search items

  • Document - General Reference

    24 Sept 2019

    Document - General Reference

    MIPAS-QWG-Validation-Telecon-24092019-MOM.pdf

    A summary of the main conclusions of the MIPAS teleconference on 24/09/2019 and the list of the new Action Items.

  • Document - General Reference

    19 July 2019

    Document - General Reference

    MIPAS-QWG-Validation-Telecon-19072019-MOM.pdf

    A summary of the main conclusions of the MIPAS teleconference on 19/07/2019 and the list of the new Action Items.

  • Document - Algorithms Theoretical Baseline Document

    1 Mar 2019

    Document - Algorithms Theoretical Baseline Document

    MERIS ATBD 2-7

    Atmospheric Correction over the Ocean (Case 1 Waters)

  • Document - Algorithms Theoretical Baseline Document

    1 Mar 2019

    Document - Algorithms Theoretical Baseline Document

    Algorithm Theoretical Basis Document

    Algorithm Theoretical Baseline Document (ATBD)

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    GOME Level 0 to 1 Algorithms Description

    After 11 years of GOME measurements, with the instrument still in good shape, ESA has decided on the first complete Level 0-to-1 processing of the entire GOME data set. The main driver for this reprocessing has been the gaps in GDP solar calibration spectra over long time periods, caused by pointing issues on the ERS-2 platform. The new GDP contains improved limit checking on solar spectra, improved line selection for better spectral calibration stability, and algorithmic changes described in this document. The precision error on the solar spectrum has been reformulated, and severaloptions have been updated in the GDP extraction software, following the CHEOPS-GOME study. This comprises improved Peltier crosstalk correction in Band 1a, seasonal correction on BSDF, improvement in Polarisation Correction, and a new degradation correction of Earthshine Reflectivity. As for the Fifth Issue, we maintained the older algorithm descriptions and added the new ones to the end of each chapter.

  • Document - Algorithms Theoretical Baseline Document

    1 Mar 2019

    Document - Algorithms Theoretical Baseline Document

    MERIS ATBD 2-25

    Alternative Atmospheric Correction Procedure for Case 2 Water Remote Sensing using MERIS

  • Document - Product Document

    1 Mar 2019

    Document - Product Document

    GOME Ozone Fast Delivery Service Product Guide- A Data User Programme Project

    A Fast Delivery Service is developed by the Royal Netherlands Meteorological Institute (KNMI) to provide to Users the Global Ozone Monitoring Experiment (GOME, on board of ESA ERS-2 satellite) ozone products within 3 hours after observation. This Service meets the growing demand (by operational meteorology, laboratories, ...) for ozone products for purposes like: assimilation in numerical weather prediction models, radiation forecasts, planning of experiments related to atmospheric chemistry research.

  • Document - Algorithms Theoretical Baseline Document

    1 Mar 2019

    Document - Algorithms Theoretical Baseline Document

    MERIS ATBD 2-06

    BRIGHT PIXEL ATMOSPHERIC CORRECTION

  • Document - Product Cal/Val Plan/Report

    1 Mar 2019

    Document - Product Cal/Val Plan/Report

    ECMWF GOMOS Temperature and Ozone Validation - April 2008

    GOMOS Temperature and Ozone Validation by ECMWF: April 2008

  • Document - Product Cal/Val Plan/Report

    1 Mar 2019

    Document - Product Cal/Val Plan/Report

    ECMWF GOMOS Temperature and Ozone Validation - December 2007

    GOMOS Temperature and Ozone Validation by ECMWF: December 2007

  • Document - Product Cal/Val Plan/Report

    1 Mar 2019

    Document - Product Cal/Val Plan/Report

    ECMWF GOMOS Temperature and Ozone Validation - December 2008

    GOMOS Temperature and Ozone Validation by ECMWF: December 2008

  • Document - Product Cal/Val Plan/Report

    1 Mar 2019

    Document - Product Cal/Val Plan/Report

    ECMWF GOMOS Temperature and Ozone Validation - August 2010

    GOMOS Temperature and Ozone Validation by ECMWF: August 2010

  • Document - Product Cal/Val Plan/Report

    1 Mar 2019

    Document - Product Cal/Val Plan/Report

    ECMWF GOMOS Temperature and Ozone Validation - August 2011

    GOMOS Temperature and Ozone Validation by ECMWF: August 2011

  • Document - Product Cal/Val Plan/Report

    1 Mar 2019

    Document - Product Cal/Val Plan/Report

    ECMWF GOMOS Temperature and Ozone Validation - August 2007

    GOMOS Temperature and Ozone Validation by ECMWF: August 2007

  • Document - Product Cal/Val Plan/Report

    1 Mar 2019

    Document - Product Cal/Val Plan/Report

    ECMWF GOMOS Temperature and Ozone Validation - August 2006

    GOMOS Temperature and Ozone Validation by ECMWF: August 2006

  • Document - Algorithms Theoretical Baseline Document

    1 Mar 2019

    Document - Algorithms Theoretical Baseline Document

    MERIS ATBD 2-08

    ANOMALOUS SCATTERING AND GELBSTOFF WATERS FLAGS

  • Document - Algorithms Theoretical Baseline Document

    1 Mar 2019

    Document - Algorithms Theoretical Baseline Document

    MERIS ATBD 2-01

    CLOUD ALBEDO AND CLOUD OPTICAL THICKNESS

  • Document - Product Cal/Val Plan/Report

    1 Mar 2019

    Document - Product Cal/Val Plan/Report

    Comparison of GOMOS prototype processor versions 6-0cf and 7-0de

    Comparison of GOMOS prototype processor versions 6.0cf and 7.0de ozone profiles with ground-based and balloon-borne measurements

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Comparison of HRTP profiles from GOPR versions 7-0ab and 6-0cf

    Comparison of HRTP profiles from GOPR versions 7.0ab and 6.0cf

  • Document - Algorithms Theoretical Baseline Document

    1 Mar 2019

    Document - Algorithms Theoretical Baseline Document

    MERIS ATBD 2-07

    ATMOSPHERIC CORRECTION OVER THE OCEAN