Active filters:
Clear filters
THEMATIC AREA
Newest First
Relevance
Newest First
Oldest First
A-Z
Z-A
Technical Note
All Documents Types
Algorithms Theoretical Baseline Document
Availability Report
Campaign Report
Conference Presentation - Poster
Data Access Information
Detailed Processing Model
Frequently Asked Questions
General Reference
Input Output Data Definition
Mission Status Report
Newsletter
Proceedings
Product Cal/Val Plan/Report
Product Document
Product Handbook
Product Readme Note
Product Specifications
Publication - Paper
Quality Report
Software Verification Plan/Report
Technical Note
User Guide

OTHER RESOURCES

Browse through mission documentation and reports, and learn more about European Space Agency Earth Observation projects and opportunities.

Search items

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    ECMWF GOMOS Temperature and Ozone Validation - January 2012

    GOMOS Temperature and Ozone Validation by ECMWF: January 2012

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    ENVISAT-1 PRODUCTS SPECIFICATIONS - ANNEX A- PRODUCT DATA CONVENTIONS

    ENVISAT-1 PRODUCTS SPECIFICATIONS - ANNEX A: PRODUCT DATA CONVENTIONS

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    MOS-1 VTIR CCT Format Specifications

    The MOS-1 digital products are recorded on Computer Compatible Tapes (CCTs) in a format that is conformed to the Standard Family Format (SFF) conventions. This format has been recommended by the Landsat Technical Working Group (LTWG) and the Committee on Earth Observation Systems (CEOS). The SFF allows to read the same software data on CCTs that have been generated by different stations.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    MOS-1 MESSR CCT Format Specifications

    The MOS-1 digital products are recorded on Computer Compatible Tapes (CCTs) in a form.at that is conformed to the Standard Family Format (SFF) conventions. This format has been recommended by the Landsat Technical Working Group (LTWG) and the Committee on Earth Observation Systems (CEOS) . The SFF allows to read the same software data on CCTs that have been generated by different stations.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Technical Descrption for Design of MOS-1 Ground Stations

    The critical design review was completed in June 1983. Prototype model of MOS-1 is now being manufactured. Based on the results of the review, this document was revised to facilitate the design of the ground stations for acquisition and process of MOS-1 data.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Quality Assessment of CERSAT Altimeter Products

    The first results of the CERSAT QIP and QPR quality assessments are presented in this report.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    ENVISAT-1 PRODUCTS SPECIFICATIONS - VOLUME 16- AUXILIARY DATA FILES

    ENVISAT-1 PRODUCTS SPECIFICATIONS - VOLUME 16: AUXILIARY DATA FILES

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Envisat-style products for ATSR-1 and ATSR-2 data

    Envisat-style products for ATSR-1 and ATSR-2 data

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    AATSR Validation Implementation Plan Version 1

    AATSR Validation Implementation Plan

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    GDR2MAR - TECHNICAL NOTE

    GDR2MAR - TECHNICAL NOTE

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    GMES Sentinel-3 - Mission Requirements Document

    GMES Sentinel-3 : Mission Requirements Document The scope of thisdocument is to outline the objectives and from it the derivedscientific and mission requirements of a first GMES Sentinel-3mission planned for launch in the 2011-2012 timeframe. This MissionRequirements Document is intended to provide guidelines for thetechnical implementation of the mission.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Envisat Mission Extension Spacecraft Operations Timeline

    The Envisat mission extension beyond 2010 implies the satellite altitude to be decreased through a series of in-plane manoeuvres. This document has been issued following the Orbit Change Operational Plan Work Package WP.E2.1.FOS.1100 and describes the Envisat instrument, PEB and SM activities that shall be carried out before, during and after the altitude reduction.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Envisat Mission Extension Instrument Switching Plan

    The Envisat mission extension beyond 2010 implies the satellite altitude to be decreased through a series of in-plane manoeuvres. This document has been issued following the Orbit Change Operational Plan Work Package WP.E2.1.FOS.1080 and describes the Envisat instrument activities that shall be carried out before, during and after the altitude reduction.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Envisat Mission Extension Mini Commissioning Plan

    The Envisat mission extension beyond 2010 implies the satellite altitude to be decreased through a series of in-plane manoeuvres. This document has been issued following the Orbit Change Operational Plan Work Package WP.E2.1.FOS.1090 and outlines all recommended checks and activities aiming at verifying the nominal state of each instrument post orbit lowering, and/or as soon as the science data generation is resumed.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Proba-V Cal-Val Plan IQC

    Proba-V Cal/Val Plan IQC  ??? Radiometric Calibration/Validation Plan for Commissioning and Operational Phase

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Proba-V Cal-Val Plan IQC-GC

    Proba-V Cal/Val Plan IQC-GC ??? Geometric Calibration/Validation Plan for Commissioning and Operational Phase

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Scatterometer and Radiometer Land Applications

    The results obtained in the study of land applications of space-borne scatterometers and radiometers are presented here. The investigations have been conducted using data from two microwave instruments: the ERS-1 Wind Scatterometer and the SSM/I radiometer. The potential of these present systems is analysed and new inversion techniques for various applications are developed. The study also emphasises the investigation of scatterometer image resolution enhancement techniques.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    GMES Sentinels 4 and 5 Mission Requirements Document

    This Mission Requirements Document is intended to provide guidelines for the technical implementation of the mission.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Telemeter Instrumentation Schedule LMSC No-1241637 Satellite Vehicle System

    This Telemetry Instrumentation Schedule contains a listing and channel assignment of all data processed by the Satellite Vehicle System (SVS) data system. A brief description of the telemetry format is included.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Envisat Flight Operations Segment Management Information Report

    This Management Information Report (MIR) provides a status report of the ENVISAT Flight Operations Segment (FOS) Implementation and Operations activities, under the responsibility of ESOC (part of D/TOS). This report covers specifically the technical progress from January to April 2000, and includes a detailed schedule report and current action item list.