- All Categories
- Data
- News
- Missions
- Events
- Tools
- Activities
- Instruments
- Campaigns
- Documents
OTHER RESOURCES
Browse through mission documentation and reports, and learn more about European Space Agency Earth Observation projects and opportunities.
Document - General Reference
The Earth Observation Handbook, 2010 Update - Key Tables
being flown 20 Dec 1999 30 Sep 2011 5-year nominal mission life, currently in extended operations.
Document - General Reference
BIOMASS-Report-for-Mission-Selection-An-Earth-Explorer-to-observe-forest-biomass.pdf
Current comparisons show that different models give radically different predictions of the current distribution of biomass
Document - Product Document
ERS-1-WSC-FDC-Product-CCT-Format.pdf
volume Physical volume sequence nlllt>erof the last tape within the logical volume Physical volume sequence nunber of the current
Document - Quality Report
ALOS-1 PRISM Cyclic Report 25 Jan 2009
Unplanned Instrument Unavailability..................................................................................6 3.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 15 Mar 2010
Current CFI is in configuration 6.4. Previous one was configuration 6.1.
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 25 Jan 2009
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 PRISM Cyclic Report 09 Sep 2008
Checks are currently made on a weekly basis (header parameters, PDS status) to have a constant view on the mission status
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 24 Apr 2008
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 PRISM Cyclic Report 25 Jul 2008
� 3 SOFTWARE & AUX FILE VERSION CONFIGURATION Current Optical Processor Version ESRIN Matera Tromso 4.05 09/
Document - Quality Report
ALOS-1 PRISM Cyclic Report 10 Dec 2008
Checks are currently made on a weekly basis (header parameters, PDS status) to have a constant view on the mission status
Document - Quality Report
ALOS-1 PRISM Cyclic Report 15 Mar 2010
Current CFI is in configuration 6.4. Previous one was version 6.1.
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 09 Mar 2008
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 25 Jul 2008
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 PRISM Cyclic Report 25 Oct 2008
Checks are currently made on a weekly basis (header parameters, PDS status) to have a constant view on the mission status
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 29 Apr 2010
Checks are currently conducted on a weekly basis due to data volumes.
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 23 Jan 2008
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 10 Dec 2008
Checks are currently made on a weekly (header parameters, PDS status) or bi- monthly (visual report) basis to have a constant
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 08 Dec 2007
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 ANVIR-2 Cyclic Report 09 Jun 2008
Unplanned Instrument Unavailability..................................................................................5 4.3 Current
Document - Quality Report
ALOS-1 PRISM Cyclic Report 12 Mar 2009
Unplanned Instrument Unavailability..................................................................................6 3.3 Current