Active filters:
Clear filters
THEMATIC AREA
Relevance
Relevance
Newest First
Oldest First
A-Z
Z-A
All Documents Types
All Documents Types
Algorithms Theoretical Baseline Document
Availability Report
Campaign Report
Conference Presentation - Poster
Data Access Information
Detailed Processing Model
Frequently Asked Questions
General Reference
Input Output Data Definition
Mission Status Report
Newsletter
Proceedings
Product Cal/Val Plan/Report
Product Document
Product Handbook
Product Readme Note
Product Specifications
Publication - Paper
Quality Report
Software Verification Plan/Report
Technical Note
User Guide

OTHER RESOURCES

Browse through mission documentation and reports, and learn more about European Space Agency Earth Observation projects and opportunities.

Search items

  • Document - Product Document

    25 Nov 2020

    Document - Product Document

    SMOS-NRT-Product-Format.pdf

    This document describes the format of the SMOS NRTP products, and is intended for NRT product users.

  • Document - Product Document

    25 Nov 2020

    Document - Product Document

    SMOS-Level-2-Ocean-Salinity-v662-release-note.pdf

    This note summarises the quality and major features of the SMOS Level 2 Sea Surface Salinity data products generated by version 662 of the Level 2OS Operational Processor (L2OS).

  • Document - Product Document

    25 Nov 2020

    Document - Product Document

    SMOS-NRT-BUFR-Specification.pdf

    This document provides the BUFR specification for the Level 1c SMOS NRT products.

  • Document - Product Document

    25 Nov 2020

    Document - Product Document

    SMOS-level-2-Soil-Moisture-NRT-V200-release-note.pdf

    Read-me-first note for the release of the SMOS Level 2 Soil Moisture Near Real Time Neural Network (L2-SM-NRT-NN) data product version 200

  • Document - Product Document

    25 Nov 2020

    Document - Product Document

    SMOS-L1a-Data-Processing-Models.pdf

    The main purpose of this document is to provide a detailed definition of the processes and algorithms contained in the Error Correction Module within the SMOS Level 1 Processor. This module is the first entry point to the processor, and is tasked with applying all the calibration procedures to the measured data (using ground and in-flight calibration).

  • Document - Product Document

    25 Nov 2020

    Document - Product Document

    SMOS-L1-Aux-Data-Product-Specification.pdf

    This document is based mainly in the Level 1 Processor Prototype‟s SMOS and auxiliary product format documents

  • Document - Product Document

    25 Nov 2020

    Document - Product Document

    SMOS-L1c-Data-Processing-Models.pdf

    The main purpose of this document is to provide a detailed definition of the processes and algorithms contained in the L1b to L1c processing module.

  • Document - Product Document

    25 Nov 2020

    Document - Product Document

    Read-me-first-note-for-the-release-of-the-SMOS-Level-1-data-products

    This note summarises the quality of the SMOS Level 1 data products generated by the version 620 of the Level 1 Operational Processor (L1OP) and by the version 620 of the Near Real Time (NRT) Processor which have been in operation from 5 May 2015.

  • Document - Product Document

    16 July 2020

    Document - Product Document

    QA4EO – SMOS Public Monthly Report - June 2020

    This document provides a summary of the status and performance of SMOS over the course of the reporting month

  • Document - Mission Status Report

    10 June 2020

    Document - Mission Status Report

    SMOS_Public_Monthly_Report_May_2020_v1.pdf

    MIRAS Report May 2020

  • Document - Product Document

    7 May 2020

    Document - Product Document

    SMOS-Monthly-Report-April-2020.pdf

    This document provides a summary of the status and performance of SMOS during April 2020.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    (A)ATSR Expert Support Laboratory FAST Level 1b Product Definition

    List of Satellite ANX time

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    34th AATSR QWG Meeting Summary

    The 34th AATSR QWG Meeting was held on 28th/29th March 2017 at RAL, Harwell, U.K. ThisMemorandum states the objectives of the Meeting, gives a selected highlight, and summarisesthe discussions that took place.

  • Document - Proceedings

    1 Mar 2019

    Document - Proceedings

    Dragon Programme Mid-Term Results

    Proceedings of the 2005 Dragon Symposium held on 27 June - 1 July 2005 in Santorini, Greece.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    SMOS-L1B-Data-Processing-Model-Document

    The main purpose of this document is to provide a detailed definition of the processes and algorithms contained in the Foreign Sources Correction and Image Reconstruction modules.

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Investigation into ATSR-1 uncalibrated brightness temperatures

    Envisat-style products for ATSR-1 and ATSR-2 data

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Processing of ATSR-2 data for July 2003 to 2008

    Envisat-style products for ATSR-1 and ATSR-2 data

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Investigations into ATSR-1 data artefacts

    Envisat-style products for ATSR-1 and ATSR-2 data

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    Investigations into ATSR-1 1-6 & 3-7m channel switching

    Envisat-style products for ATSR-1 and ATSR-2 data

  • Document - Technical Note

    1 Mar 2019

    Document - Technical Note

    GMES Sentinel-3 - Mission Requirements Document

    GMES Sentinel-3 : Mission Requirements Document The scope of thisdocument is to outline the objectives and from it the derivedscientific and mission requirements of a first GMES Sentinel-3mission planned for launch in the 2011-2012 timeframe. This MissionRequirements Document is intended to provide guidelines for thetechnical implementation of the mission.