Year | Date | Time | Orbit | Event(s) |
OPERATIONAL PHASE BEGINS | ||||
2002 | 23-Jul | |||
|
|
FPA Outgassing | ||
13:30 | 02068 | 1.6µm gain commanded to 337(dec) | ||
24-Jul | FPA Cooldown | |||
09:41 | 02080 | Cooler Compressor amplitude commanded 92(hex), Displacer amplitude commanded to 90(hex) | ||
11:21 | 02081 | Cooler Compressor amplitude commanded B4(hex), Displacer amplitude commanded to 9B(hex) | ||
25-Jul | AATSR-IOR-0014 outgassing completed | |||
09:15 | 02094 | IR Auto-gain Offset Loop activated | ||
04-Sep | Repeat of BB Functional Test AATSR-IOR-0015 | |||
11:11 | 02682 | Started | ||
11:19 | 02682 | Complete | ||
08-Sep | 06:45 | 02736 | AATSR in HEATER Mode | |
07:19 | 02737 | AATSR in STANDBY Mode | ||
10-Sep | 14:34 | 02770 | AATSR in STANDBY Mode | |
11-Sep | 14:00 | 02784 | AATSR in TR HEATER Mode | |
20:08 | 02787 | AATSR in HEATER Mode | ||
12-Sep | 13:13 | 02798 | AATSR in Measurement Mode | |
18-Nov | Start of Leonid Meteor Shower Precautions | |||
06:43 | 03753 | AATSR Powered Off | ||
20-Nov | End of Leonid Meteor Shower Precautions | |||
09:05 | 03783 | AATSR in STANDBY mode | ||
10:48 | 03784 | AATSR in TR HEATER mode | ||
15:28 | 03787 | AATSR in HEATER mode | ||
15:40 | 03787 | AATSR in MEASUREMENT mode | ||
18-Dec | 02:24 | 04180 | AATSR in HEATER Mode | |
14:00 | 04187 | AATSR in MEASUREMENT Mode | ||
2003 | 31-Jan | 09:39 | 04814 | AATSR Outgassing Started |
03-Feb | 17:15 | 04861 | AATSR Outgassing Completed | |
20-Feb | ENVISAT Command Procedure Failure, all instruments commanded OFF | |||
07:27 | 05099 | AATSR commanded OFF | ||
21-Feb | Envisat OCM out-of-plane Orbit Inclination Maintenance Manoeuvre | |||
04:42 | 05111 | Single Burn (Delta-V 1.6901 m/sec) | ||
Instrument Recovery | ||||
18:36 | 05120 | AATSR commanded to STANDBY | ||
20:12 | 05121 | AATSR commanded to TR HEATER | ||
22-Feb | Instrument Recovery | |||
00:51 | 05123 | AATSR commanded to HEATER | ||
23-Feb | Instrument Recovery | |||
10:26 | 05143 | AATSR commanded to MEASUREMENT | ||
15-Mar | Spacecraft problem, all instruments off | |||
04:21 | 05426 | AATSR off | ||
18-Mar | Instrument Recovery | |||
13:54 | 05475 | AATSR commanded to STANDBY | ||
15:30 | 05476 | AATSR commanded to TR HEATER | ||
20:43 | 05479 | AATSR commanded to HEATER | ||
19-Mar | Instrument Recovery | |||
13:22 | 05489 | AATSR commanded to MEASUREMENT | ||
18-May | Spacecraft Maintenance/Instrument Switchoff | |||
06:25 | 06343 | AATSR commanded to HEATER, then OFF | ||
19-May | Spacecraft Maintenance/Instrument Recovery | |||
11:34 | 06361 | AATSR commanded to STBY | ||
20-May | Spacecraft Maintenance/Instrument Recovery | |||
07:33 | 06373 | AATSR commanded to TR HEATER | ||
12:20 | 06376 | AATSR commanded to HEATER | ||
12:35 | 06376 | AATSR commanded to MEASUREMENT | ||
01-Aug | 09:17 | 07419 | AATSR Outgassing Started | |
05-Aug | 10:34 | 07477 | AATSR Outgassing Completed | |
13-Aug | Reflectance Channels Gains Update | |||
11:00 | 07592 | AATSR commanded | ||
14-Aug | Amendment to 1.6um Channel Gain | |||
15:33 | 07608 | AATSR commanded | ||
05-Sep | AATSR OFF due to ENVISAT PL-SOL for all instruments | |||
07-Sep | 09:55 | 07949 | AATSR back in measurement mode | |
28-Oct | 02:55 | 08675 | AATSR into HEATER mode for Envisat Out-of-Plane Manoeuvre | |
06:30 | 08677 | AATSR returns to MEASUREMENT mode | ||
25-Nov | 10:10 | 09080 | AATSR outgassing procedure begins | |
28-Nov | 18:30 | 09128 | AATSR outgassing complete | |
03-Dec | 07:18 | 09193 | Envisat PL-SOL: AATSR and all other instruments OFF | |
05-Dec | 11:41 | 09224 | Envisat restored to nominal with AATSR available | |
2004 | 04-Feb | 02:40 | 10092 | AATSR unavailable from 02:40 to 08:01 due to orbital correction manoeuvre |
16-Apr | 08:40 | 11126 | Cooler off, Start Outgassing | |
19-Apr | 12:15 | 11171 | Cooler On, Start Cooldown | |
17:04 | 11174 | Cooldown Completed | ||
20-Apr | 08:09 | 11183 | Auto Gain Offset Loop Restarted | |
09:23 | 11183 | Visible Channel Gains Updated | ||
21-Apr | 07:42 | 11197 | Blackbody Cross-over Test Part I Started | |
22-Apr |
07:13 |
11211 |
Blackbody Cross-over Test Part II started | |
23-Apr |
08:17 |
11226 |
Auto Gain Offset Loop restarted, Instrument in Nominal Operation | |
23-Jul |
09:00 |
12529 |
Outgassing begins as planned in orbit #12529 | |
27-Jul |
12586 |
Cooler On, Start Cooldown | ||
15:39 |
12590 |
Cooldown Complete | ||
21-Sep |
03:00 |
13384 |
AATSR into HEATER mode for OCM | |
18:00 |
13393 |
AATSR into MEASUREMENT mode | ||
19-Nov |
10:00 |
14233 |
Outgassing begins as planned in orbit #14233 | |
22-Nov |
12:06 |
14277 |
Cooler On, Start Cooldown | |
18:10 |
14281 |
Cooldown Complete | ||
2005 | 08-Apr | 08:19 | 16236 | Coolers commanded off. Outgassing begins as planned in orbit #16236 |
11-Apr | 08:22 | 16279 | Cooler commanded on | |
13:16 | 16282 | Cooldown completed by orbit #16282 and by the time given | ||
17-May | 07:47 | 16794 | Blackbody cross-over test starts | |
09:03 | 16794 | Reflectance channels gains update commanded | ||
19-May | 08:24 | 16823 | Blackbody cross-over test ends. | |
22-Aug | 08:46 | 18183 | Coolers commanded off. Outgassing begins as planned in orbit #18183 | |
25-Aug | 09:13 | 18226 | Coolers commanded on. Cool-down begins | |
13:55 | 18229 | Cooldown completes | ||
15:25 | 18230 | Outgassing procedure concludes | ||
07-Sep | 04:20 | 18409 | AATSR into HEATER mode for OCM | |
13:40 | 18415 | AATSR into MEASUREMENT mode | ||
16-Dec | 09:40 | 19844 | Coolers commanded off. Outgassing begins as planned in orbit #19844 | |
19-Dec | 10:29 | 19887 | Coolers commanded on | |
15:07 | 19890 | Cooldown verified | ||
2006 | 10-Jan | 01:00 | 20196 | AATSR into HEATER mode for ENVISAT OCM |
13:00 | 20204 | AATSR into MEASUREMENT mode | ||
28-Mar | 00:45 | 21299 | AATSR into HEATER mode for ENVISAT OCM | |
13:00 | 21306 | AATSR into MEASUREMENT mode | ||
06-Apr | 02:09 | 21428 | Envisat down - AATSR OFF | |
18:39 | 21438 | AATSR ON and back in MEASUREMENT mode | ||
26-Jun | 07:20 | 22591 | Blackbody Cross-Over Test starts | |
08:10 | 22591 | Blackbody Cross-Over Test completed with Auto-Gain/Offset loop restored | ||
04-Aug | 01:25 | 23145 | AATSR in Reset/Wait, anomaly under investigation | |
13:11 | 23153 | AATSR back in measurement mode | ||
07-Sep | 16:39 | 23641 | AATSR OFF owing to ENVISAT AOCS STD-A anomaly | |
10-Sep | 15:48 | 23684 | AATSR coolers commanded on | |
22:02 | 23687 | AATSR in HEATER mode | ||
11-Sep | 07:07 | 23693 | AATSR returns to Measurement Mode | |
28-Nov | 07:58 | 24810 | AATSR to OFF following Envisat memory maintenance anomaly | |
30-Nov | 15:07 | 24843 | AATSR returns to Measurement Mode | |
12-Dec | 18:02 | 25016 | AATSR unavailable due to an Envisat LVL3 PROTOCOL ERROR AND INTERRUPT | |
16-Dec | 08:26 | 25068 | AATSR returns to Measurement Mode | |
2007 | 22-Jan | 23:52 | 25607 | AATSR to HEATER Mode during ENVISAT OCM |
23-Jan | 12:05 | 25614 | AATSR returns to MEASUREMENT Mode | |
02-Apr | 23:51 | 26609 | AATSR to HEATER Mode during ENVISAT OCM | |
03-Apr | 07:00 | 26613 | AATSR returns to MEASUREMENT Mode | |
18-May | 08:19 | 27258 | Cooler off - AATSR outgassing begins | |
21-May | 06:59 | 27300 | Cooler commanded on | |
08:28 | 27301 | Cooler commanded to nominal levels | ||
11:50 | 27303 | Cooldown complete | ||
16-Jul | 22:05 | 28111 | AATSR to HEATER Mode for ENVISAT OCM | |
17-Jul | 07:11 | 28116 | AATSR returns to MEASUREMENT Mode | |
24-Sep | 12:27 | 29107 | AATSR OFF following payload switch-off due to Service Module Anomaly (Global AOCS Surveillance triggered) | |
28-Sep | 13:40 | 29165 | AATSR Returns to MEASUREMENT mode. Outgassing also completed | |
13-Nov | 07:53 | 29820 | BB cross-over test starts. IR channel auto/gain offset control disabled, +XBB HEATER to OFF, -XBB HEATER to ON | |
15-Nov | 08:30 | 29849 | BB cross-over test ends. Instrument configuration returns fully to nominal | |
03-Dec | 22:00 | 30115 | Into STANDBY mode for the duration of Envisat OCM and maintenance | |
06-Dec | 07:29 | 30149 | Return to MEASUREMENT mode | |
13-Dec | 06:44 | 30249 | Into STANDBY mode for the duration of Envisat memory maintenance activities | |
14-Dec | 08:17 | 30264 | Return to MEASUREMENT mode | |
2008 | 16-Jan | 16:11 | 30741 | Science data interrupted due to Envisat High Speed Multiplexer (HSM) anomaly. No science data until HSM recovered |
17-Jan | 09:38 | 30751 | AATSR to HEATER mode for Envisat/HSM recovery procedure | |
10:35 | 30752 | Envisat/HSM returns to nominal after reset | ||
13:02 | 30753 | AATSR returns to MEASUREMENT mode | ||
11-Feb | 23:45 | 31118 | AATSR out of MEASUREMENT mode for Envisat OCM | |
12-Feb | 09:11 | 31123 | AATSR returns to MEASUREMENT mode | |
21-Apr | 22:05 | 32119 | AATSR out of MEASUREMENT mode for Envisat OCM | |
22-Apr | 07:15 | 32124 | AATSR returns to MEASUREMENT mode | |
23-Jun | 07:46 | 33012 | AATSR cooler off - outgassing begins | |
26-Jun | 14:18 | 33059 | AATSR outgassing completed | |
30-Jun | 22:05 | 33121 | AATSR out of MEASUREMENT mode for Envisat OCM | |
01-Jul | 07:00 | 33126 | AATSR returns to MEASUREMENT mode | |
08-Sep | 22:06 | 34123 | AATSR out of MEASUREMENT mode for Envisat OCM | |
09-Sep | 07:00 | 34128 | AATSR returns to MEASUREMENT mode | |
17-Nov | 22:05 | 35125 | AATSR out of MEASUREMENT mode for Envisat OCM | |
18-Nov | 07:00 | 35130 | AATSR returns to MEASUREMENT mode | |
25-Nov | 08:10 | 35231 | AATSR cooler off - outgassing begins | |
28-Nov | 21:33 | 35282 | AATSR outgassing completed. All channels return to nominal | |
2009 | 26-Jan | 23:44 | 36128 | AATSR out of MEASUREMENT mode for Envisat OCM |
27-Jan | 06:49 | 36132 | AATSR returns to MEASUREMENT mode | |
06-Apr | 23:44 | 37130 | AATSR out of MEASUREMENT mode for Envisat OCM | |
07-Apr | 06:50 | 37134 | AATSR returns to MEASUREMENT mode | |
21-Apr | 07:53 | 37335 | BB cross-over test starts. IR channel auto/gain offset control disabled, +XBB HEATER to OFF, -XBB HEATER to ON | |
23-Apr | 08:31 | 37364 | BB cross-over test ends. Instrument configuration returns fully to nominal | |
28-Apr | 13:03 | 37438 | Envisat data transmission interrupted due to HSM anomaly. No AATSR science data available | |
29-Apr | 10:14 | 37451 | AATSR out of MEASUREMENT mode for Envisat HSM reset | |
10:24 | 37451 | Envisat HSM restored to nominal following reset | ||
10:27 | 37451 | AATSR returns to MEASUREMENT mode | ||
26-May | 09:32 | 37837 | AATSR cooler off - outgassing begins | |
29-May | 21:09 | 37887 | AATSR outgassing completed. All channels return to nominal | |
20-Jul | 22:07 | 38632 | AATSR out of MEASUREMENT mode for Envisat OCM | |
21-Jul | 06:55 | 38637 | AATSR returns to MEASUREMENT mode | |
28-Sep | 22:07 | 39634 | AATSR out of MEASUREMENT mode for Envisat OCM | |
29-Sep | 07:00 | 39639 | AATSR returns to MEASUREMENT mode | |
08-Oct | 03:15 | 39765 | Envisat PMC switched AATSR into WAIT following two or more TM format errors | |
17:05 | 39774 | AATSR returns to MEASUREMENT mode | ||
07-Dec | 22:04 | 40636 | AATSR out of MEASUREMENT mode for Envisat OCM | |
08-Dec | 07:00 | 40641 | AATSR returns to MEASUREMENT mode | |
2010 | 11-Jan | 09:00 | 41129 | AATSR cooler to off - outgassing begins |
14-Jan | 14:07 | 41175 | AATSR outgassing completed. All channels return to nominal | |
15-Feb | 22:04 | 41638 | AATSR out of MEASUREMENT mode for Envisat OCM | |
16-Feb | 07:00 | 41643 | AATSR returns to MEASUREMENT mode | |
26-Apr | 22:08 | 42640 | AATSR out of MEASUREMENT mode for Envisat OCM | |
27-Apr | 07:00 | 42645 | AATSR returns to MEASUREMENT mode | |
26-May | 08:18 | 43061 | BB cross-over test starts. IR channel auto/gain offset control disabled, +XBB HEATER to OFF, -XBB HEATER to ON | |
28-May | 08:55 | 43090 | BB cross-over test ends. Instrument configuration returns fully to nominal | |
29-Jun | 08:49 | 43548 | AATSR cooler to off - outgassing begins | |
02-Jul | 20:32 | 43598 | AATSR outgassing completed. All channels return to nominal. | |
05-Jul | 23:54 | 43643 | AATSR out of MEASUREMENT mode for Envisat OCM | |
06-Jul | 07:00 | 43647 | AATSR returns to MEASUREMENT mode | |
20-Oct | 16:12 | 45170 | AATSR cooler to off - outgassing begins | |
27-Oct | 18:55 | 45272 | AATSR outgassing completed. All channels return to nominal | |
2011 | 03-Apr | 15:52 | 47540 | Envisat platform anomaly results in Payload/PEB switch-off. AATSR OFF |
04-Apr | 13:50 | 47553 | AATSR in STANDBY for outgassing, cooler still off | |
06-Apr | 15:42 | 47583 | Outgassing is completed, All channels available | |
26-Apr | 13:58 | 47869 | Envisat HSM Anomaly - AATSR science data acquired but unavailable | |
28-Apr | 09:53 | 47895 | Envisat HSM Anomaly recovered - AATSR science data available again | |
25-May | 10:46 | 48284 | Blackbody cross-over test starts. IR channel auto/gain offset control disabled, +XBB HEATER to OFF, -XBB HEATER to ON | |
27-May | 11:12 | 48313 | Blackbody cross-over test ends. Instrument configuration returns to normal | |
07-Oct | 08:19 | 50222 | Outgassing starts, AATSR cooler to off | |
10-Oct | 14:50 | 50269 | Outgassing is completed. All channels available | |
14-Oct | 01:15 | 50318 | AATSR out of MEASUREMENT mode for Envisat OCM | |
06:00 | 50321 | AATSR returns to MEASUREMENT mode | ||
2012 | 23-Jan | 07:25 | 51773 | AATSR to STANDBY for Envisat memory anomaly and to start outgassing |
26-Jan | 13:52 | 51820 | AATSR outgassing is completed. All channels available | |
29-Feb | 22:21 | 52313 | AATSR out of MEASUREMENT mode for planned Envisat OCM maintenance | |
01-Mar | 06:00 | 52318 | AATSR returns to MEASUREMENT mode | |
08-Apr | 12:28 | 52868 | Envisat data transmission anomaly announced. No data via S-, Ka- and X-band | |
09-Apr | 02:12 | 52876 | Final AATSR science data packet processed through EDS-X, acquired 10:56, April 8th, 2012 | |
09-May | End of ENVISAT mission declared |