ESA Earth Home Missions Data Products Resources Applications
    24-Jul-2014
EO Data Access
How to Apply
How to Access
Index
  Acknowledgements and contact
List of figures and tables
List of tables
 Additional information on the GOMOS measurements
Periods of data unavailabilities
Evolution of the IPF
Glossary
List of abbreviations and acronyms
Product types and structure
Other sources of information
GOMOS-related ESA web pages
Publications (peer-reviewed publications and proceedings of conferences)
Secondary products
Scintillation and turbulence
Aerosols and PSC
Product validation
NO2 and NO3 measurements
O3 measurements
CAL/VAL activities
Retrieval and processing issues
Assimilation of GOMOS products
Mesosphere
Specific events
GOMOS-related theses
Other technical reports by members of GOMOS SAG, ESL and QWG
Level2 processing
How to
FAQ
Access tools
GOMOS products toolbox
EnviView
Data selection
PCD summary in the Level2 products
Obliquity
Star properties
Data availability
Presentation of the GOMOS products
Description of the products
Product content
Product structure
Time availability
Data size
Presentation of the instrument and the measurements
Scientific achievements
Validation results
Measurement characteristics
Accuracy
Occultation obliquity
Geographical and time coverage
Star characteristics
Mission planning
Modified mission scenario since August 2005
Instrument description and measurement principle
Calibration phase and monitoring activities
Measurement technique
GOMOS Product Handbook
Content of the products
Services
Site Map
Frequently asked questions
Glossary
Credits
Terms of use
Contact us
Search


 
 
 


6.3 Periods of data unavailabilities

Since the launch of ENVISAT in March 2002, some instrument failures specific to GOMOS occurred during operations. Some of the major anomalies prevented the measurements. Also, it may have been necessary to switch-off the instrument for the time needed to characterize the anomaly, to estimate its impact on the operations and on the measurements, and to either solve the problem or find a bypass or workaround solution.

From 1 May 2003, measurement failures had been occurring due to the progressive reduction of the instrument Field of View on the nominal side. Nominal operations resumed on 19 July 2003 after the switch to the redundant System Control Unit.

A failure of the Elevation voice-coil system (telescope elevation drive for the rallying of the telescope to prepare for a star observation) prevented the nominal operations between 24/01/2005 – 18/07/2005. Nominal operations resumed after the implementation of a new mission scenario, taking into account a reduced azimuth Field of View (the last systematic failure occurred on 26/01/2006). GOMOS has been operating in the azimuth range between -5° and 20° (instead of between -10.8° and 90.0° for the nominal case) between September 2005 and February 2006. Since February 2006, time-varying limits of the azimuth window are used in order to optimize the mission objectives, while its range has been kept to 25°. It is estimated that this reduced azimuth range results to a loss of about 50% in the number of measured occultations.